Experienced Land Surveyor with over 20 years of experience in cadastral and engineering land surveying. Proficient in using robotic Total Stations, various Data Collection Devices and Carlson Survey Software. Trained to use GNSS and UAV photogrammetric technology for large-scale topographic surveys and Control Surveys. Specialized in computations for staking out proposed design data, calculation of volumes, gradients for sewerage and drainage, extraction of feature cross sections and profiles, and the overall management of Engineering / Construction Surveys.
Overview
24
24
years of professional experience
Work History
Road and Engineering Land Surveyor
Ministry Of Public Works And Digital Economy
06.1999 - Current
Measured and marked property lines and key topographic features.
Performed field calculations to complete assessments.
Set up precise measurement and control equipment.
Facilitated construction by mapping out utility installations and establishing reference points, grades and elevations.
Coordinated survey crew activities and oversaw field operations.
Employed GPS technology to pinpoint baseline, meridian, tier and range coordinates defining boundaries of township residential lots.
Followed local, regional and national guidelines for land surveying.
Used Trimble and AutoCAD to create detailed maps from raw field data.
Read and used topographical data to complete analysis of land plots and roadways.
Assessed individual survey project needs and planned workflows.
Compiled measurement and marker data from plats and drawings using public records to determine geographical boundaries of land parcels and utility locations.
Communicated with brokers, contractors, developers, attorneys and lenders to determine circumstances of survey request and report on factors most important to specific applications.
Made proactive adjustments to policies and procedures to meet changing demands.
Advised architects, contractors and engineers on ideal structure placement given drainage patterns, hydrology and topographical factors.
Completed complex technical surveys for development of roadway, intersection and bridge construction plans.
Evaluated crew workloads and available resources to prepare schedules and equipment allocations.
Gathered, organized and modeled data for survey reports and presentations.
Supervised survey projects measuring volume capacity of landfills and containment ponds.
Consulted public records and contacted previous owners to conduct research on ownership, usage and zoning history.
Coordinated with architects, developers and inspectors in developing new construction designs for commercial, residential and industrial developments.
Processes and Total Quality Management Dep Head at Ministry of Digital Economy and EntrepreneurshipProcesses and Total Quality Management Dep Head at Ministry of Digital Economy and Entrepreneurship