Summary
Overview
Work History
Education
Skills
LANGUAGES
Timeline
Generic

Manuel Espinosa

Leming,US

Summary

Passionate motivated responsible at whatever I do. I take pride in what I do. I have established a good name in what I do. I practice safety above all things. I have 10+ years of experience in MSE walls sound walls and dirt work/concrete flat work. I can perform in all weather conditions: Winter rain summer. I can also work at a fast pace and maintain safety. And above all things dedicated to doing things the right way with integrity.

Overview

24
24
years of professional experience

Work History

Equipment Operator

Mortenson Construction
Colorodo Burlington
03.2025 - 02.2026
  • I ran a Blade 112-114 also a small Dozer for grade work. All sizes of Excavators as well from hauling off materials and cutting grade

Heavy equipment, foreman

Bechtel
Corpus Christi
08.2024 - 03.2025
  • I supervise a small group of operators ranging from Skid Steer Operator roller operator Dozer operator and Excavator Operator my daily task were to excavate trenches backfill trenches build road place materials to finish grade typical plant work

GPS blade operator

Ranger construction
San Antonio, Texas
02.2024 - 08.2024
  • My daily task were setting up base station and placing GPS on Blade. Some of the task that I was given was to prep subgrade for base material. I also did chemical lime stabilizing stabilized concrete mixing also processing base I would build roads ditches and build crane pads

Area Superintendent

Baker Gulf Coast Construction
Cameron, LA
03.2026 - Current

I was in charge of all underground excavations

I also was in charge of all the backfills prepping all foundations for Concrete and all drainage also had a pretty large team of operators and laborers

Lead General Foreman

Zachary Industrial
Plaquemine, LA
03.2023 - 01.2024
  • I ran a pretty large group of people on this project 7dirt crews with 10 to 12 people in each group. My task were 90 day look ahead Scheduling and planning
  • Ordering materials underground drainage
  • Soil stabilizing
  • And Finish grade work. Everything that pertains to earthwork

General Foreman

Sabine Pass, TX
04.2022 - 03.2023
  • Crews just a little over 20 people. Finish grade/drainage Was my task. I installed RCP pipe
  • Cut out reserve pit and drainage ditch. I also did all the soil stabilizing And the final base

MSE Wall Foreman

Webber construction
Houston, TX
01.2021 - 03.2022
  • I was placing MSE wall panels I was also backfilling all the panels that I was placing and maintaining roads to make access

Heavy Equipment, Dirt Foreman

Portland, Texas
06.2019 - 01.2021
  • Supervise a dirt crew Read blueprints Set up GPS on equipment Material removal Backfill Drainage Process base Build a job site from blueprints And GPS Also lead a crew and removing materials from jobsite backfilling and compacting materials to spec also coordinate With filling material to prep for concrete and asphalt paving coordinate dump truck drivers roller operators excavator operators and laborers Dozers and Blade operators .Turn in time also charge codes Also set up with inspector to do safety proctors on materials and proof rolls

Dirt Foreman

Zachry Industrial
Beaumont, Texas
02.2016 - 05.2019
  • Dirt supervisor Responsible for turning in time for the crew turning in the cost codes also ordering materials such as Chemical lime base topsoil sand and stabilize Sand Was in charge of 7 to 10 man crew From Blade operator dozer operator excavator operator rollers labors off-road trucksFrom Blade operator dozer operator excavator operator rollers labors off-road trucks Also prepped for asphalt and concrete paving

Supervisor

Zachary construction zopb
Houston, Texas
11.2014 - 02.2016
  • Lead man my responsibilities assisting in stabilizing backfill on MSE walls also coordinating a crew of 4 to 6 men from equipment operators to concrete finishers and Labers also to Setting wall panels and coping's and pouring moment slabs also drill shaft tie back walls and sound the walls From staging the panels on the job site to setting the panels in place anchoring them To doing foundation improvements also riprap curbs columns and caps back wall wing walls and S ET's Also had a crew of four doing the punch list on the job site from rubbing and patching concrete to miscellaneous concrete work

Equipment Operator

Zachry
San Antonio, TX
02.2002 - 04.2007
  • I ran a Blade 112-114 also a small Dozer for grade work. All sizes of Excavators as well from hauling off materials and cutting grade

Education

High School Diploma - undefined

Pleasanton High School
Pleasanton, Texas
05.2000

Skills

Familiar with using a tablet and a computer

I Know how to read drawings

familiar with making schedules and planning work

I’m familiar with GPS on equipment

soil stabilization

I can do concrete drain pipe

I am familiar with digging around utilities,underground

I can handle working with large groups of people

LANGUAGES

English

Timeline

Area Superintendent

Baker Gulf Coast Construction
03.2026 - Current

Equipment Operator

Mortenson Construction
03.2025 - 02.2026

Heavy equipment, foreman

Bechtel
08.2024 - 03.2025

GPS blade operator

Ranger construction
02.2024 - 08.2024

Lead General Foreman

Zachary Industrial
03.2023 - 01.2024

General Foreman

04.2022 - 03.2023

MSE Wall Foreman

Webber construction
01.2021 - 03.2022

Heavy Equipment, Dirt Foreman

06.2019 - 01.2021

Dirt Foreman

Zachry Industrial
02.2016 - 05.2019

Supervisor

Zachary construction zopb
11.2014 - 02.2016

Equipment Operator

Zachry
02.2002 - 04.2007

High School Diploma - undefined

Pleasanton High School
Manuel Espinosa