Tile Setter
Sullivan Tiling
Stewartsville, MO
01.2024 - Current
- Installed backer boards on floors and walls to provide a base for the tiling process.
- Applied waterproofing membranes to showers, tubs, sinks. to prevent water seepage into underlying structures.
- Prepared sub-floor surfaces by removing existing material or filling in cracks.
- Measured, cut, and installed ceramic tile, marble, and stone using hand tools and power cutting tools.
- Laid out tile patterns and ensured proper alignment of tiles.
- Mixed adhesive according to manufacturer's instructions for wall and floor tiles installation.
- Grouted walls, floors and countertops with appropriate materials.
- Cleaned all work areas after completing each job assignment.
- Ensured that all customer requirements were met before leaving job site.
