Performed new well electrical installs on pads, supporting startup and production operations
- Installed and wired step-up transformers and completed terminations for pad power distribution
- Installed and terminated ESP drives , ensuring proper power and control wiring connections
- Built and installed 240V load center racks, including breaker setup and full terminations
- Installed PLC well skids and completed all field wiring terminations.
- Installed pressure transmitters on wellheads and flowlines, including signal wiring and terminations
- Performed PLC terminations and verified proper operation
- Completed PLC retrofit installations, replacing/upgrading existing systems and re-terminating wiring as needed
- Responded to electrical troubleshoot calls, diagnosing faults in drives, transformers, PLC panels, and field devices to restore production