PROFESSIONAL SUMMARY
Overview
Work History
Education
Skills
Timeline

MARCO ORDAZ

Facilities Electric
Houston,Tx.
2027
Years of experience

I have been a site manager / electrical foreman for the past 28 years . I have Managed projects from $100,00 up to $15,000,000 & helped to complete on time & under budget . I have managed electrical crews from as little as 6 men & up to 60 men plus all subs under our contract . I have successfully accomplished/ completed projects of all type , Retail Stores , Grocery Stores , Churches , Ware Houses , High Rise Bldg's. High Schools , Jr. High schools Stadiums. Drug Stores , Parking lots , Build outs & more . I'm well Organized keeping crews informed of any changes & or extra work needed to be preformed . Keeping a good attitude & open communication through out the Projects has made me very Successful. My Level of experience is he follows. Under Ground layout & install including Center Point Duct Banks & Center Point XFMR's. Generators , Motor Controls , Ansul Systems , Main Switch Board layout & install. Transformer & Panel install , Feeder wire install , meg test & Terminate feeder wire , electrical Overhead & wall rough in / layout . lighting contactor/ controls , site pole UG install & site pole stand / terminate, Pull Branch wire , run feeder conduit , run branch conduit . Motor Starters , Disconnects install & terminate. install all types of electrical systems . Very Thorough & detailed in studying Drawing , spic's, RFI's , CPR etc. Work very well with crew members & other trades I'm welling to teach & always receptive to learn from others Ideas / suggestions .

Work History

Site Project Manager

13 Years 10 Months
LECS LTD. | 12.2012 - 2022
  • Manage Project ,Coordinate with GC & Other Trades
  • Report daily Time sheets & employee daily Production.
  • Turn into PM a Daily Project Report to ensure all party's are up to date .
  • Daily Employee Man Power Report.
  • Daily Employee Health Log & Temperature report / Covid -19
  • Daily JHA , Task & man power
  • Track progress of construction operations, including utilization and arrival of tools and materials.
  • Weekly tool box talks , & Led Project as the Competent person on Site (OSHA-30)Enforce & Promote Safety .
  • Examine & inspect all work installed to ensure quality control & a craft men install .
  • Schedule any & all Center Point , City , Architectural , commissioning Inspections , through out the project.
  • Generate a 2-week look ahead & order material / tools & equipment on a timely manor to prevent any delay'
  • Coordinate with Lead men & crew daily layout & task , to ensure employees will meet daily task / Quotas .
  • Work with Low Voltage subs and onsite staff to improve operations and employee relations.
  • Department .
  • Present and maintain a clean cut & professional Image through out project .
  • Keep clean set of as Built's & Panel Schedules & up date on a daily bases or as needed.
  • Enforce & promote daily clean up on daily task for a safe ,clean project .
  • Keep & coordinate open communication Field Opp. person , Project Manager & BIM Design Team .
  • Maintain a clean cut & Professional Image through the Project .

Site Foreman

Facilities Electric | 2024 - Current
  • Supported site crews to maintain safe, efficient electrical installation workflows.
  • Assisted with daily work schedules, materials, and subcontractor coordination to keep project progress on track.
  • Checked site safety requirements and electrical code standards for compliance.
  • Assigned tasks to maintain quality workmanship and consistent production standards.
  • Shared job updates with project managers, trades, and site personnel.
  • Guided electricians and apprentices on procedures, tools, and safe work practices.
  • Kept accurate records of daily activities, including time sheets, material logs, and safety reports.
  • Delivered quality workmanship by tracking construction activities from start to finish.
  • Built strong working relationships with clients, suppliers, and local authorities to support smoother project execution.
  • Performed regular site inspections and followed established safety protocols.
  • Kept daily site operations moving at an efficient production pace.
  • Completed daily JHA, daily reports, and weekly tool talks.
  • Created 2-week look-ahead schedules.
  • Inspected daily installed work for quality control.

Site Foreman

Performance Electrical | 2024 - 2024

Supported project operations by running daily JHA, daily time tracking, weekly toolbox talks, material ordering, and coordination with GC, PM, and other trades; planned 2-week look-ahead and assigned work to crew.

Prepared drawing layouts and managed installation of electrical gear.

Managed installation of distribution panels, switchgear, transformers, and disconnects.

Installed feeder and branch conduit systems to support electrical distribution infrastructure.

Pulled and terminated wire connections according to required specifications.

Enforced safety practices in accordance with company policy.

Foreman / PM / Estimator.

Wood Electrical Services | 2022 - 2024
  • Supported electrical crew with safe, efficient jobsite operations.
  • Helped organize daily assignments so materials, tools, and labor were ready for scheduled tasks.
  • Checked work progress to confirm code compliance and quality standards.
  • Trained apprentices on conduit installation, wiring practices, and jobsite safety procedures.
  • Fixed field issues quickly to avoid delays and keep projects moving.
  • Completed daily JHA, daily reports, weekly time records, weekly toolbox talks, and coordination with GC, PM, and other trades.
  • After project completion, advanced into assistant PM and small job estimator role.

Site Foreman

7 Years 2 Months
Trio Electrical | 07.2005 - 09.2012
  • Report Daily Time & employee daily production .
  • Report a Daily project report , to include any & all problems , issues , delays that are preventing project progress .
  • Generate a 2-week look ahead & order material on a timely bases to prevent any delays .
  • Coordinate Project schedule & Task with GC & Other Trades.
  • Report Daily GC & Co. JHA man power & daily task .
  • Weekly Tool Box Talks & Led Project as the Competent Person on Site.
  • (OSHA-30) Enforce & promote Safety.
  • Schedule & Order Large Tools & Equipment needed to preform task ie . underground & overhead install.
  • Coordinate ,layout & Implement daily task to Lean man & crews .
  • Examine & inspect work installed to ensure quality control .
  • Schedule any & all City ,Center Point , Commissioning , Architectural Inspections as needed.
  • Keep clean set of as Built's & Panel Schedules & update on a daily bases or as needed .
  • Enforce & promote daily clean up of daily task for a safe & clean Project.
  • Arrive on site 1hr. early , coordinate days task with lean men ,ensure all containers , gang boxes , elect. Rm's. etc. are unlocked & ready for all crews.
  • Oversee Inventory , Gear , equipment , panels , lights etc. keep a detailed invoice for what is on site & order items as needed to ensure good track on Items through out project.
  • Coordinate & Assist any & all Low Voltage Subs that maybe under our contract .
  • Coordinate & keep open communication with Project Manager , BIM Design team & HR Department .
  • Present and maintain a clean cut & professional Image through out project .
  • Keep clean set of as Built's & Panel Schedules & up date on a daily bases or as needed.
  • Enforce & promote daily clean up on daily task for a safe ,clean project .
  • Keep & coordinate open communication Field Opp. person , Project Manager & BIM Design Team .
  • Maintain a clean cut & Professional Image through the Project .

Electrical Foreman

13 Years 4 Months
Rick Berger Electrical Cont. | 03.1992 - 07.2005
  • Layout & assign daily task to crew members .
  • Daily reports of project progress , Problems , Issues , Delays .
  • Turn in weekly time sheets .
  • Coordinate with GC & other Trades to ensure project is progressing .
  • Order material , tools & equipment needed to preform task .
  • Weekly tool box talks , OSHA-10
  • Keep a clean set of as built's & panel schedules & up date as needed .
  • Maintain a clean cut & professional image .
  • Schedule any & all City , Center Point inspections .
  • Work in accordance with NEC electrical codes.

Education

GED - Basics

HCC | Houston, Tx. | 08-2004
  • Attended HCC to complete my GED
  • Journey Man electrician for the past 25 years
  • Grand father as JM in 1996 .
  • Self trained to understand & follow NEC Code book .
  • All my experience has been hands on out on the field.
  • Planning to attend IEC Master Prep class & apply to take exam for masters electrical License .

Skills

Site management
Material and equipment procurement
Production planning
Safety compliance
Lock Out / Tag out
Scissor lift
Trencher
Schedule management
Monitor construction quality
Meet code requirements
Oversee subcontractors
OSHA -30
Boom lift
Excavator / mini excavator
Lull/ fork lift

Timeline

Site Project Manager

LECS LTD.
12.2012 - 2022Read More

Site Foreman

Trio Electrical
07.2005 - 09.2012Read More

Electrical Foreman

Rick Berger Electrical Cont.
03.1992 - 07.2005Read More

HCC

GED from Basics
Read More

Site Foreman

Performance Electrical
2024 - 2024Read More

Foreman / PM / Estimator.

Wood Electrical Services
2022 - 2024Read More

Site Foreman

Facilities Electric
2024 - CurrentRead More
MARCO ORDAZ