
Dedicated Concrete Technician with extensive experience at the City of McKinney, skilled in concrete finishing and rebar installation. Proven ability to ensure precision in project execution while adhering to safety protocols. Strong attention to detail and effective communication foster successful teamwork and problem-solving in high-pressure environments.
My job was to Prep Concrete Jobs & finish Jobs by cutting the concrete in multiple sections so its easier to remove & Make sure every cut is a straight cut with no curves or offsets. once old concrete is removed, I would grade, Put rebar & set forms. Next day we would pour the concrete & finish it with a broom finish. Adhered to safety protocols while performing tasks in field.
Service Line Tech, My Job was Replacing all Cooper Water Lines in a sub division to Polly Water Lines. We would Vac All the way down to the Water Main & replace the line from the Main to the Water Meter. We would replace 8 Lines a day
GAG Construction LLC was a grade & pour Concrete Foundations company, My role was to prep every home with Vapor Plastic, Rebar, Structural Cables before we were able to pour. I would have to read the foundation Plans & make sure everything lined up perfectly with the plans for inspection to pass.
Class A CDL Driver