Summary
Overview
Work History
Education
Skills
Certification
Timeline
Training
References
Generic

Marcus Boone

Kennesaw,GA

Summary

Results-oriented construction management professional with 26 years of extensive experience overseeing the complete development seamless construction of housing and commercial structures. Astute strategic leader capable of driving large-scale collaborative undertakings, as well as managing multiple priorities and projects with dynamic deadlines using strong organizational skills, people management abilities, and sound decision-making capacity. Effective problem solver capable of handling difficult situations associated with the challenges and pressures of meeting schedules and producing quality product. Demonstrated excellent oral and written communication aptitude in engaging productively with government officials, the public and internal personnel. Proven ability to read and understand drawings and specifications. Technical proficiency in MS Office Suite, MS Project, RMS Software, Primavera P6, and Procore Software. Seasoned Construction Superintendent boasting [Number]-year career in construction supervision and monitoring. Dedicated to ensuring projects are completed on-time, within budget and in compliance with local building codes and laws. Thorough knowledge of construction processes and project management strategies.

Overview

26
26
years of professional experience
1
1
Certificate

Work History

Construction Superintendent

Ortho Sport and Spine Physicians
01.2022 - 01.2024
  • Traveled weekly meeting with real estate professionals to view properties; inspected properties for lease and purchase.
  • Oversaw qualification, selection and contract negotiations for the design team and all vendors and consultants.
  • Negotiated lease terms, square footage pricing and T& I allowances with brokers.
  • Oversaw remodeling and opening of 19 medical facilities for Ortho Sport and Spine Physicians.
  • Maintain project folders in a timely manner through duration of the project. Created 3 week look ahead schedule for trades.
  • Directed Construction crews onsite in all construction activities and resolved construction issues on site.
  • Procured signage for marketing; exterior and interior of buildings;
  • Reviewed construction budget and provided recommendations relative to pricing submitted.
  • Traveled and visited job sites weekly. Inspecting quality of work.
  • Experienced in documenting and photographing daily construction work; providing updates to upper management.
  • Coordinated with different agencies for delivery and installation of medical equipment in each facility.
  • Review invoices submitted by the design team, contractor, consultants, vendors and others to be sure they are consistent with contractual requirements.
  • Confirmed work being billed is actually complete by performing a site walk prior to approval..
  • Second floor Remodel of Ortho Sport &Spine Facility (Chicago, IL): Completed structural modifications to strengthen second floor for MRI unit installation and X-ray machine
  • Installed new electrical panels, framed walls with lead lined sheetrock, installed new door frames/doors, sprinkler systems, AHU’s, plumbing lines, water heater, furnaces, sinks, toilets, millwork, flooring, bathroom tile, rubber base, painting, fire alarm system, and glass installation
  • Scheduled inspections with City inspectors and Fire department for Certificate of Occupancy
  • Held subcontractor meetings, updated 3 week-schedule look ahead and held weekly safety briefings.
  • Developed and monitored construction schedules to ensure projects were completed on time and within budget.
  • Assisted in the development and implementation of safety programs to ensure compliance with OSHA regulations.

Project Superintendent / SSHO / QC

ACE Consulting, LLC
01.2019 - 01.2022
  • Direct all aspects of daily operations involving engagement with and oversight of various subcontractors, project managers, and government representatives to determine and document project needs, isolate, and address safety issues, maintain adherence to project timelines, and enable timely completion and full compliance to client, industry, AHA, federal, quality, and contract standards
  • Submitted daily reports and pictures on construction progress to upper management
  • Completed inspections with City officials and Fire departments
  • Retail Store Remodel (Decatur GA): Oversaw the Remodeling of commercial retail store for Salon Lofts
  • Conducted daily safety briefings with subcontractors; coordinated trades / 2-week schedule / daily work
  • Removed demising wall, installed concrete floors, installed new electrical panels, AHU’s/ ductwork, and sprinkler piping/sprinkler heads; Installed ceiling grid and acoustical ceiling tiles; flooring; installed new doors and locks
  • Completed daily progress reports and documented work with photographs; submitted to upper management
  • Communicated with City inspectors concerning inspections for framing, electrical and mechanical inspections
  • Completed walk through with Fire inspector for testing of sprinkler system and fire alarm systems
  • Remodeling of Target Store (Flowood, MS): Completed a $5 M dollar remodeling project covering the interior buildout of office space, and installation and upgrade of framing, sheetrock, new doors, and sprinkler system
  • First Floor Modification of Marta Headquarters Building (Atlanta, GA): Coordinated the removal of ceiling tiles, doors and framing, existing walls, drywall and metal stud framing, and fire extinguisher
  • Site Development and Building Project, Joint Base – Naval Weapons Station (Charleston, SC): Ensured completion of all project-related tasks involving underground utility piping (RCP), site excavation, sloping, sub-grade work, site clearing, concrete and asphalt paving, and pre-fabrication metal buildings before the designated deadline of September 29, 2020
  • Asphalt Parking Lot Projects, Veterans Hospital (Salisbury, NC): Led the construction of three parking lots with a total value amounting to $1M as part of an effort to improve the parking experience for all veterans and disabled visitors who are coming to the Salisbury VA Medical Center
  • Road Refurbishment Project, Department of Energy (Amarillo, TX): Expedited the timely delivery of a $31M federal government project involving the pavement of 173,824 tons of Hot-Mix Asphalt type D and 4000 CY of concrete for numerous milled and reclaimed asphalt, driveways, concrete pads, and swales for drainage
  • Tampa VA Hospital (Tampa, FL): Completed various site preparation works including demolition, removal and replacement of acoustical ceiling, removal of drywall sections, retention and isolation of existing HVAC ceiling diffusers, installation of HEPA filters and infection control solutions, and rollout of thermal and moisture protection technologies
  • Carried out the installation of a new 400amp MLO panel in the emergency side of Bldg
  • 38 switchgear room G026-38, along with the installation of a 24volt relay, an electrical feeder from Switchgear room G026-38 to Urological Procedures room C003-38, and (1) 400amp, 480v, 3ph, (18) circuit panel board.

Site Development Construction Superintendent

Summit Construction
Stone Mountain, GA
01.2018 - 01.2019
  • Oversaw the execution of various construction-related processes including the oversight and procurement of materials and equipment, coordination, and schedule management of all phases of construction, and management of subcontractors, laborers, and equipment operators
  • Supervised the demolition of existing building structures, excavation of concrete foundations, and removal of structural beams, vegetation, and underground piping installations
  • Provided expert guidance to the implementation of procedures related to erosion control, safety fencing, surveying, asphalt installation, asbestos abatement, and site grading to contain dust accumulation, remove debris, and identify and report issues that can potentially influence the progress and completion of the project
  • Submitted daily reports and photographs to upper management documenting construction progress.

Operator

Change Properties Renovation, LLC
Jackson, MS
01.2009 - 01.2019
  • Oversaw daily operations related to the analysis and interpretation of blueprints, assessment of plan specifications, estimate renovation costs, execution of quality control processes during regular home inspections, and coordination of property rehabilitation projects, along with both commercial and residential interior renovations
  • Managed the acquisition of vendor and contractor bids for crucial services and supplies such as plumbing and heating, landscaping, renovation, and maintenance services, arranged subcontractor jobs, and scheduled material delivery
  • Engaged with local government officials and agencies to secure inspections and official Certificates of Occupancy
  • Spearheaded the rollout of $1.5M real estate management and investment business that operated a portfolio of numerous single-family house properties, and multi-unit apartments
  • Instrumental in guaranteeing high-quality accommodation for all tenants through intensive supervision of tasks related to the painting and decoration of walls, and installation of GFCI’s, wiring systems, water heaters, toilets, sinks, tubs, sheetrock, roofing, and linoleum flooring.

Construction Manager

IAP-RMS
Bagram AB, Afghanistan
01.2010 - 01.2012
  • Provided government oversight and construction management of high-level construction projects consisting of structural, mechanical (packaged HVAC), electrical power generation, civil infrastructure, and other projects
  • Responsible for Construction of 7 small Combat Outposts (COP) as management of construction: prepared pricing data, schedules
  • Performed construction review, provided integral consultations, and draft Statements of Work (SOWs)
  • Supported contractors in preparing, monitoring, and adjusting construction schedules and review of pay Full cycle participation including construction, commissioning, and closeout (over $50 million in projects)
  • Effectively assessed existing and new construction, infrastructure, and electrical power generation plants
  • Worked with US Army Prime Power COR in grid layout and placement of generators on isolated small bases.

Heavy Equipment Operator/Supervisor

United States Air Force
01.1998 - 01.2009
  • Planned, constructed, and repaired airfield pavements, roads, streets, curbs, surface mats, membranes, other improved areas using paving and surfacing procedures
  • Operated and maintained heavy construction equipment, such as loaders, excavators, dozers, backhoes, and dump trucks
  • Operated tractor-trailer combinations, transporting construction equipment, and materials
  • Conducted daily safety briefings with all onsite personnel; Identified Jobsite hazards
  • Experienced in excavating waterlines, gas-lines, fire-hydrants, and sewer lines for repair and replacement by plumbing personnel
  • Provided erosion control
  • Backfilled trenches; bedded piping with sand and compacted soil in 6-inch lifts
  • Placed shoring in trenches to protect workers; Stepped trench walls to prevent collapse
  • Collected soil, aggregate, asphalt, and concrete samples for laboratory tests
  • Investigated proposed work sites to determine resource requirements
  • Inspected work to ensure quality and compliance with policies, regulations, and specifications
  • Experienced in functions such as operating tools and equipment to prepare areas for construction and to maintain roads, runways, and grounds; and mixing and placing, concrete and bituminous materials
  • Operated construction equipment to prepare areas for constructing and maintaining roads, grounds, and airfield surfaces, or concrete work, soil stabilization, flexible pavement construction and maintenance.

Production Manager-Asphalt

Pave Con
Byram, MS
01.2014 - 01.2015

• Managed Asphalt and Concrete crews; scheduled Jobs and called in 811 locate; calculated hours worked and approved timecards.
• Coordinated with plants for hot asphalt materials needed throughout Louisiana and Mississippi for paving jobs; ordered concrete.
• Set up equipment delivery to job sites along with scheduled fueling. Delivered materials to jobsites when needed.
• Delivered safety briefings to foreman’s and crews before projects commenced.
• Oversaw equipment maintenance on in house equipment. Ordered saw blades, kettle pots, jackhammers etc.
• Ensured that operators inspect their equipment so that all equipment is in proper operating condition.
• Experienced in milling and paving Target stores, Walmart’s, Movie theaters, churches, City walking trails, and installing bollards.
• Experienced in sealcoating parking lots, resurfacing, reclamation and repaving.
• Consulted with superintendents about problems encountered, delays, and other issues that may affect paving operations.
• Made sure production goals are met.

Education

Bachelor of Science - Sports and Health Sciences

American Military University

Associate of Science - Construction Technology

Community College of Air Force

Associate of Arts - General Studies

Central Texas College

Skills

  • Construction & Property Management
  • Project Management
  • Site Supervision & Inspection
  • Equipment & Inventory Management
  • Team Building & Leadership
  • Technical Reporting & Documentation
  • Materials Management
  • Civil Engineering
  • Heavy Equipment Operations
  • Quality Control
  • Problem Resolution
  • Regulatory & Safety Compliance
  • Contract Negotiation
  • Time & Cost Management
  • People Management
  • Project Status Reporting
  • Cost Optimization
  • Strategic Planning

Certification

  • NCCER Certified Heavy Equipment Operator
  • Hard Hat Trench Safety Certification
  • Hard Hat Excavator Operator Safety Certification
  • Primavera 6
  • New Home Construction
  • OSHA 30
  • OSHA 40 Hour HAZWOPER Certification
  • EM-385-1 Certification
  • USACE Quality Control
  • CPR- First Aid Certification

Timeline

Construction Superintendent

Ortho Sport and Spine Physicians
01.2022 - 01.2024

Project Superintendent / SSHO / QC

ACE Consulting, LLC
01.2019 - 01.2022

Site Development Construction Superintendent

Summit Construction
01.2018 - 01.2019

Production Manager-Asphalt

Pave Con
01.2014 - 01.2015

Construction Manager

IAP-RMS
01.2010 - 01.2012

Operator

Change Properties Renovation, LLC
01.2009 - 01.2019

Heavy Equipment Operator/Supervisor

United States Air Force
01.1998 - 01.2009

Bachelor of Science - Sports and Health Sciences

American Military University

Associate of Science - Construction Technology

Community College of Air Force

Associate of Arts - General Studies

Central Texas College
  • NCCER Certified Heavy Equipment Operator
  • Hard Hat Trench Safety Certification
  • Hard Hat Excavator Operator Safety Certification
  • Primavera 6
  • New Home Construction
  • OSHA 30
  • OSHA 40 Hour HAZWOPER Certification
  • EM-385-1 Certification
  • USACE Quality Control
  • CPR- First Aid Certification

Training

  • USACE Quality Control
  • CPR – First Aid Certification
  • Leadership/Management Training
  • Civil Engineer Management
  • Resource Control & Cost Awareness
  • Contract & Construction Documents
  • Construction & Vendor Management

References

References available upon request.
Marcus Boone