Compared installations against drawings and project specifications for compliance purposes.
Maintained detailed knowledge of internal specifications and design standards as well as applicable regulatory requirements.
Gained high proficiency in computer software - Microsoft Office, specifically Excel-based templates, Prolog, Project Site, and Autodesk.
Engaged in structural steel quantity take offs utilizing On Screen Takeoff software.
Built engaging relationships with trade partners while conducting PCL management software trainings.
Manage project specific documentation software.
Create and track RFIs
Review and compare subcontractor submittals with the project specifications.
Conduct weekly owner/architect meetings to provide project specific updates.
Field Engineer
Hensel Phelps
Thornton, CO
05.2021 - 05.2022
Assist subcontractor coordination and quality control. Worked closely with Foremen to ensure daily tasks are being executed.
Proficient in computer software - Project Site, Prolog, Excel.
Assist the subcontractors with Field Layout by utilizing the Trimble GNSS Systems. Working closely with subcontractors to interpret plans and specifications for specific layout activities.
Engage in material deliveries and inspection of material to verify the quality, quantity, and condition, and check for any damaged items.
Gaining supervisory experience by overseeing small labor crews.
Project Intern
GH Phipps Construction Companies
Fort Collins, CO
05.2020 - 08.2020
Worked with CMIC, Bluebeam, StructionSite and 360 Cameras.
Organized and was primary lead for punch walk reviews with the architect.
Engaged in meeting minutes for weekly OAC meetings.
Created procurement logs.
Created and tracked RFIs for the field supervisors.
Project Intern
Layton Construction Co. Inc.
San Antonio, TX
05.2019 - 08.2019
Fluent with CMIC, BIM360.
Prepared daily project status updates to inform staff and document project changes.
Helped create and update procurement schedules throughout project.
Involved with Preconstruction buyout process.
Reviewed Subcontractor O&Ms and warranties during closeout stage.
Education
Bachelor of Science - Construction Management
Colorado State University
05.2021
Associate of Applied Science - Welding Technology
Front Range Community College - Larimer Campus
05.2017
Projects
Aspen Club & Spa
The Aspen Club & Spa is a LEED/WELL luxury fitness club and resort. The club is surrounded by 20 three and four bedroom serviced residences.
North Water Treatment Plant
The 100 acre water treatment facility will be capable of treating up to 75 million gallons of water per day. Compared to other Denver water treatment plants, this will reduce annual operating costs by 1.7 million.
United States Army Corps of Engineers Consolidated Space Operations Facility (CSOF) project:
The 190,480 SF facility is to comply with ICD-705 for Sensitive Compartmented Information Facilities, U.S. Department of Defense Anti-Terrorism/Force Protection requirements, high performance sustainable building requirements and additional cybersecurity measures.
CYS Data Center:
The CYS Campus SFF Data Center Project consists of a single story 36.8MW Data Center, each consisting of five (5) COLO spaces. The individual building total approximately 215,000 SF with 99.9% power availability, and an approximately 14,000 SF Administration area.