Summary
Overview
Work History
Education
Skills
Timeline
Generic

Maria Coronado

San Luis,AZ

Summary

Analytical Quality Assurance Inspector with eight years of experience in photovoltaic systems. Proven ability to conduct thorough inspections with a strong focus on detail and quality standards. Demonstrated success in collaborating with teams to enhance product outcomes. Actively seeking opportunities to further develop skills in a dynamic organization.

Overview

8
8
years of professional experience

Work History

QAQC

Conti
08.2024 - 05.2025
  • Prioritized and organized tasks to efficiently accomplish service goals.
  • Completed quality assurance and quality control assessments for PV modules.
  • Managed QAQC activities for trenching work involving medium voltage and direct current.
  • Oversaw QAQC processes related to TBX terminations, inverters, and electrical components.
  • Collaborated closely with team members to achieve project objectives and meet deadlines.

Senior Quality Control Inspector

BHI Energy: McFarland Solar Project Phase A & B
Dateland, Arizona
06.2023 - 04.2024
  • Conducted visual and mechanical inspections on project components to ensure compliance with specifications.
  • Oversaw quality assurance for mechanical and electrical design, enhancing reliability and performance.
  • Reviewed design drawings and manuals to verify requirements, identifying discrepancies early in installation.
  • Documented inspection results, highlighting non-conformities in processes for corrective actions.
  • Collaborated with team members to promptly resolve quality issues and maintain project standards.

Wire Management Foreman

SOLV Energy: Red Mesa Solar Project
07.2022 - 11.2022
  • Managed production upkeep and documentation to ensure operational efficiency.
  • Coordinated logistics with suppliers for timely material delivery and proper unloading.
  • Conducted site evaluations, reviewed documentation, and performed production audits.
  • Oversaw crews during staging and installation of materials according to IFC specifications.
  • Ensured quality control standards were met within department prior to handover.
  • Trained new crew members on installation techniques and safety practices.
  • Monitored work progress to maintain quality standards during installations.
  • Communicated with project managers regarding timelines and resource needs.
  • Inspected tools, materials, and equipment to ensure quality standards were met.
  • Ensured all workers adhered to company policies and procedures.

Quality Insurance Inspector

Aerotek, Inc,: First Solar Twiggs Solar Project
Dry Branch, Georgia
02.2020 - 12.2020

Executed detailed inspections of structural and electrical installations to uphold quality and safety standards.

Ensured alignment of sub-contractors with drawing specifications for effective quality assurance.

Performed follow-ups on quality deficiencies to implement corrective actions and meet requirements.

Documented and maintained inspection records alongside quality assurance documents for accountability.

Completed and submitted paperwork for approved areas, highlighting critical issues and rejected sections.

Reviewed project drawings, installation manuals, and specifications to ensure clarity on expectations.

Commissioning Technician

DKD Electric: Phoebe Solar Project
02.2018 - 11.2018

Executed comprehensive tests on photovoltaic system, including insulation resistance, polarity, and open circuit voltage.

Conducted short circuit current, module performance, and ground ring tests to ensure optimal functionality.

Applied lockout-tagout (LOTO) system, completed documentation, and compiled test reports.

Troubleshot photovoltaic system by identifying deficiencies and installing necessary labels.

Quality Control Technician

HCS Renewable Energy: Balm, Peace Creek,GrangeHall
01.2017 - 01.2018

Conducted inspections on structural, module, and electrical components.

Verified torque values, repaired, and replaced defective materials and installation errors.

Executed module scanning and mapping procedures.

Trained and coached new employees to enhance skill sets.

Ensured maintenance of a clean and safe work environment.

Education

Adult First Aid/CPR/AED

American Red Cross
02-2022

Solar Electric Design & Installation

Solar Energy International PVOL101
11-2020

Large-Scale Ground Mounted PV Installation

Energy International CE525
09-2020

NFPA 70E Arc Flash Training

360 Training

OSHA 30

360 Training

Skills

  • Microsoft Excel and Word
  • OneDrive and Outlook
  • Nonconformance reporting
  • Records management
  • Calibration of torque testers
  • Collaboration and organization
  • Task prioritization
  • Friendly, positive attitude
  • Bilingual in Spanish

Timeline

QAQC

Conti
08.2024 - 05.2025

Senior Quality Control Inspector

BHI Energy: McFarland Solar Project Phase A & B
06.2023 - 04.2024

Wire Management Foreman

SOLV Energy: Red Mesa Solar Project
07.2022 - 11.2022

Quality Insurance Inspector

Aerotek, Inc,: First Solar Twiggs Solar Project
02.2020 - 12.2020

Commissioning Technician

DKD Electric: Phoebe Solar Project
02.2018 - 11.2018

Quality Control Technician

HCS Renewable Energy: Balm, Peace Creek,GrangeHall
01.2017 - 01.2018

Adult First Aid/CPR/AED

American Red Cross

Solar Electric Design & Installation

Solar Energy International PVOL101

Large-Scale Ground Mounted PV Installation

Energy International CE525

NFPA 70E Arc Flash Training

360 Training

OSHA 30

360 Training
Maria Coronado