I have many years of experience in electrical harness building. I am dedicated in any job I put before I and strive to always do the best job i and strive to always do the best job i can do. I am a fast learner and always grow to love the job.
Overview
20
20
years of professional experience
Work History
Electrical Harness Builder
Almega Tru-flex
09.2021 - 04.2022
Interpreted blueprints, schematics, and diagrams of project requirements and initiated appropriate electrical installations.
Read technical drawings, diagrams and project documentation to make accurate decisions about electrical system installations and repair work.
Repaired and installed new wiring and circuits.
Adhered to safety protocols, OSHA standards and building codes in installation of systems, operation of equipment, and handling of materials.
Operated tools according to prescribed safety practices.
Interpreted electrical codes and diagrams to complete electrical repair and installation tasks.
Connected wires to circuit breakers, transformers or other components.
Repaired or replaced wiring, equipment and fixtures using hand tools and power tools.
Followed state and local building regulations based on National Electrical Code.
Spliced, joined and connected wire to fixtures and other electrical components.
Interpreted drawings, wiring diagrams, flow charts and written descriptions of project requirements.
Metal Cutter
Miller Manufacturing Corperation
08.2020 - 05.2021
Followed company policies and OSHA requirements to maintain work safety.
Multi-tasked to keep all assigned projects running effectively and efficiently.
Reviewed work orders to determine materials needs, where to make cuts and how to complete high-quality products in line with specifications.
Made timely adjustments to machine operations and components to meet demands of different production orders.
Loaded and positioned raw materials in loading and feeding mechanisms.
Reviewed completed orders for quality and accuracy.
Upheld housekeeping standards by keeping space clean and free of hazards.
Kept equipment clean, repaired, and lubricated to maximize performance.
Operated press to achieve highest print quality and productivity with minimal scrap.
Restocked workstations with supplies to prevent work delays.
Inspected printed products for clarity, color accuracy, and conformance to provided specifications.
Removed excess materials during and after runs and collected for reuse or put into removal bins.
Promptly removed completed loads from press.
Checked completed work to identify flaws and sort items by grade.
Moved materials and fixtures such as paperboard rolls, dies and repeats using pallet jacks, hand carts, and forklifts.
Electrical Harness Builder
Kauffman Engineering
07.2002 - 09.2019
Interpreted blueprints, schematics, and diagrams of project requirements and initiated appropriate electrical installations.
Read technical drawings, diagrams and project documentation to make accurate decisions about electrical system installations and repair work.
Repaired and installed new wiring and circuits.
Adhered to safety protocols, OSHA standards and building codes in installation of systems, operation of equipment, and handling of materials.
Operated tools according to prescribed safety practices.
Interpreted electrical codes and diagrams to complete electrical repair and installation tasks.
Connected wires to circuit breakers, transformers or other components.
Repaired or replaced wiring, equipment and fixtures using hand tools and power tools.
Followed state and local building regulations based on National Electrical Code.
Spliced, joined and connected wire to fixtures and other electrical components.
Interpreted drawings, wiring diagrams, flow charts and written descriptions of project requirements.