Summary
Overview
Work History
Education
Skills
Courses Certifications
Languages
Websites
Timeline
Generic

Maria J. Castillo

Cypress,TX

Summary

Results-oriented Industrial Engineer with five years of experience driving process optimization and cost savings, yielding over $5 million in financial benefits. Proven success in automating processes and leading teams to enhance productivity, reduce waste, and improve safety standards in dynamic manufacturing environments.

Overview

6
6
years of professional experience

Work History

Process Engineer

Integra
Houston, Texas
04.2025 - Current
  • Redesigned product and manufacturing processes using DFM principles, reducing labor costs by 96% and material costs by 43%, generating $3 million in savings.
  • Reconfigured facility layout to maximize floor space, enabling twofold production capacity to meet rising demand.
  • Led lean manufacturing workshops for over 200 production employees, driving adoption of continuous improvement methodologies.
  • Established standardized manufacturing process sequences and conducted time studies to define takt time, enhancing workflow consistency and line balancing.

Industrial Engineer II

Daikin Comfort
Houston, Texas
05.2024 - 04.2025
  • Led initiative to eliminate assembly line bottlenecks, reduce downtime, and optimize labor that resulted in a 14% increase in productivity and an $871K increase in profits.
  • Implemented scheduling rules by analyzing future demand and model complexity to determine labor requirements and optimal line cycle time, achieving $680K in labor savings.
  • Automated manual processes across all assembly lines, resulting in $400K labor savings and $941K in safety savings.
  • Led daily cross-functional meetings to review KPIs and implement kaizens, resulting in a 10% reduction in labor costs and a 15% reduction in scrap.

Components Industrial Engineer

84 Lumber
Richmond, Virginia
10.2020 - 05.2024
  • Developed and implemented a new layout that optimized workflow, reduced material handling time by 30%, and improved job ergonomics.
  • Analyzed a production process and implemented an improvement plan that reduced setup time by 17% and increased overall productivity by 20%.
  • Significantly reduced waste by implementing an automated waste management system and decreased equipment downtime by 40%.
  • Supported 15 manufacturing locations in process optimization and continuous improvement initiatives, enhancing operational efficiency.
  • Monitored and analyzed weekly production data to identify improvement areas, increasing data entry quality by 10%.
  • Collaborated with leadership to design facility layouts and establish equipment requirements for 3 startup locations, facilitating smooth operations.
  • Collaborated with the training department and developed a new hire and safety online program that included operating procedures, best work practices, and safety protocols.

Education

Bachelor of Science - Industrial Engineering

Cullen College of Engineering, University of Houston
Houston, TX
05-2020

Skills

  • AutoCAD, SolidWorks, Microsoft Office
  • Process Optimization
  • Lean Manufacturing
  • Data Analysis
  • Project management
  • Six sigma methodologies

Courses Certifications

  • Six-Sigma Green Belt Certification
  • OSHA 30 HR General Industry Training

Languages

Spanish
Native/ Bilingual
English
Full Professional

Timeline

Process Engineer

Integra
04.2025 - Current

Industrial Engineer II

Daikin Comfort
05.2024 - 04.2025

Components Industrial Engineer

84 Lumber
10.2020 - 05.2024

Bachelor of Science - Industrial Engineering

Cullen College of Engineering, University of Houston
Maria J. Castillo