Laborer
• Equipment Operation: Safely and efficiently operated skid steers and all-terrain forklifts to transport heavy solar components, stage materials across expansive jobsites, and support structural installations.
• BESS Technical Work: Executed precise electrical terminations and wiring configurations within Battery Energy Storage Systems.
• Testing & Commissioning: Conducted insulation resistance testing (Megger testing) on high-voltage cables and components to verify system integrity and prevent electrical faults.
• Quality Control (QC): Performed QC inspections across solar and BESS installations, identifying and rectifying deviations to ensure compliance.
