An organized and motivated individual, eager to utilize time management and organizational skills across diverse settings. Seeking mid to senior-level opportunities to enhance abilities while contributing to company growth. Ready to offer 10 years of construction experience to a challenging new role with room for advancement.
Overview
11
11
years of professional experience
Work History
Quality Control Supervisor
Dematic Corp
Grand Rapids, MI
09.2018 - 07.2024
Directed and supervised team of up to 40 resources in daily operations
Conducted daily meetings with team members to discuss upcoming tasks and project deadlines
Monitored employee productivity levels on a regular basis to identify areas of improvement
Coached team members to develop long-term career goals
Maintained positive working relationship with fellow staff and management
Identified needs of customers promptly and efficiently
Oversaw quality control to identify inconsistencies and malfunctions
Tracked project schedules and encouraged teams to complete tasks on time while staying on budget
Served as a liaison between customer and Dematic project management
Coordinated between Dematic disciplines and customer representatives for a successful Go Live
Advised, planned, and implemented both short- and long-term projects
Worked with SAP material management software to identify and locate material and parts for conveyor systems
Mentored new hires, navigating between language barriers, and ensured daily safety protocols
Led crews in over 15 projects for Dematic including customers such as Amazon Fulfillment, Walmart DC, Ross DC, Burlington Coat Factory DC, FedEx DC, Americold Facility, and Nordstrom DC
Addressed revisions and troubleshooted solutions with engineer/project management
Calculated manpower plans with resource management, site management, and project management teams
Maintained a safe work environment with zero accidents or lost workdays
Reported to site manager and project manager with status updates on project progress and estimated completion dates, noting delay issues
Utilized Microsoft Excel and Word for project documents, status, and reports.
Workface Planner
Dematic Corp
Buckeye, AZ
11.2023 - 04.2024
Developed communication strategies to keep leads and management informed of progress throughout the lifecycle of projects
Attended meetings with onsite teams to discuss project and status updates
Facilitated discussions between teams and departments about potential roadblocks that could impact project progress
Used daily system logs such as status reports, progress trackers, six-week look-ahead, RFIs (Request for Information), and lessons learned to document production information, discussing issues with management
Converted Construction Work Packages (CWP) into Installation Work Packages (IWP)
Ensuring all necessary resources are available and constraints are removed before releasing the IWP to the field
Ensure continuity and integration of the work packaging structure across project phases
Coordinate among engineering, procurement, and onsite teams
Issue complete and constructible IWP in line with the project schedule
Utilized UPV (Universal Plant Viewer) software to create IWPs
Worked with SAP material management software and Power BI to identify and locate necessary material for work packages and installation teams.
Quality Control Tech 2/Tech 3
Dematic Corp
Grand Rapids, MI
04.2018 - 09.2018
Tested, diagnosed, and repaired malfunctioning conveyor systems
Replaced worn or defective parts with new ones
Inspected completed work for accuracy and quality assurance
Monitored performance parameters to ensure optimal operation of machinery
Adjusted machine settings as needed to optimize production processes
Utilized hand tools such as wrenches, pliers, screwdrivers
Developed punch list spreadsheets for operational and quality issues and recommended corrective actions
Utilized service & installation manuals for troubleshooting guidance when necessary
Documented, filed, and maintained proper inspection records and quality assurance documents
Troubleshooted equipment malfunctions; utilizing knowledge of material handling systems.
Conveyor Installer
IMI Logistics
Phoenix, AZ
07.2015 - 04.2018
Installed new conveyor systems in accordance with manufacturer specifications
Led crews through assembly/disassembly of conveyor components including pneumatics
Connected motors, gearboxes, and other equipment to create operational conveyor systems
Adjusted tensioning devices such as pulleys, chains, sprockets
To maintain proper belt tracking
Inspected belts and rollers for wear and tear on a regular basis
Replaced worn out parts as necessary to prevent further damage or failure of the system
Installed machine guards where applicable in order to protect personnel from moving machinery parts
Mounted brackets onto floors for supporting conveyor structures during installation process
Assembled and prepped conveyor beds by installing pulleys, routing and securing air hoses and wires to conveyor beds using tie wraps and hand tools; prior to installation
Checked alignment of drive shafts and pulleys at various points along the length of the conveyor system
Provided technical support onsite, when necessary, in order to resolve any operational issues that may occur during operation
Read blueprints and drawings and took measurements to plan layout and installation
Led a 5-person crew through all conveyor installation phases, including inventory management and punch list tag corrections before customer Go Live deadlines
Installed catwalks, steel channels, and header-steel drops/hangers to specifications while prioritizing daily safety measures through job hazard analysis sheets.
Structural Welder
Aerotek
Phoenix, AZ
10.2017 - 01.2018
Installed and welded steel beams, columns, girders, and other structural elements
Welded joints in flat, horizontal, vertical, and overhead positions as required by the task at hand
Operated cutting torches to cut metal pieces prior to welding them together
Cleaned surfaces of metals prior to welding them together using wire brushes or grinders
Removed loose materials and thick scale, slag or rust to prepare material surfaces for welding
Checked tools, equipment and safety gear for proper performance
Maintained clean and tidy work area
Scraped off excess spatter using portable grinders and arc-cutting equipment
Kept complete set of tools and gear for use on each job, including hammers, stinger and socket set
Positioned steel units, aligned holes and inserted temporary bolts while checking alignments and joining steel parts
Set up hoisting equipment to lift and place structural steel items.
MIG Welder
Aerotek
Phoenix, AZ
10.2014 - 07.2015
Set up and operated MIG welding machines according to established safety procedures
Monitored welds for quality assurance purposes
Inspected finished products to ensure accuracy in accordance with blueprints and specifications
Cleaned workpieces prior to welding using wire brushes, grinders or chemical solutions
Maintained a clean workspace throughout the day
Organized tools, supplies and equipment at the end of each shift
Completed welds in flat, horizontal, vertical or overhead positions
Produced smooth and even welds by maintaining consistent approach
Examined welds to check bead size and other specifications
Prepared workpiece edges by grinding, cutting, buffing or bending to verify snug fit
Recognized, set up and operated shielded metal arc and gas metal arc welding equipment
Aligned and clamped workpieces using rules, squares or hand tools
Adjusted weld machines to correct settings for precision and waste reduction.
Pipeline Laborer
Boots Smith Oilfield Services LLC.
Albuquerque, NM
07.2013 - 08.2014
Assisted with the installation of pipelines by using various tools and equipment such as shovels, backhoes, and augers
Cleaned work areas after completion of jobs to ensure safety and cleanliness
Removed soil or debris from trenches around pipes before installing them
Helped in laying out the line of a new pipeline route according to project plans
Attended training sessions related to safety protocols when handling hazardous materials
Measured and marked right-of-way for pipeline ditches with tape measures and paint
Filled pipes with water or air, observing pressure gauges and pipes to troubleshoot and locate leaks
Grinded welds to ensure a smooth finish on the surface of the pipes.
Education
Some College (No Degree) - Welding Technology
University of New Mexico
Gallup, NM
Some College (No Degree) - Construction Management
University of Phoenix
Phoenix, AZ
Skills
Strategic Planning
Training and mentoring
Employee Motivation
Welding Techniques
Equipment Assembly
Pneumatic Systems
Blueprint Interpretation
Effective Communication
Task Prioritization
Professionalism
Workplace Safety
Material Handling Equipment
SAP Material Management
Attention to Detail
Maintenance and repairs
Mechanical Systems
Multitasking
Self-Motivation
Teamwork and Collaboration
Troubleshooting skills
Documentation And Reporting
Quality Control
Scheduling
Equipment testing
Functional Testing
Project Coordination
Timeline
Workface Planner
Dematic Corp
11.2023 - 04.2024
Quality Control Supervisor
Dematic Corp
09.2018 - 07.2024
Quality Control Tech 2/Tech 3
Dematic Corp
04.2018 - 09.2018
Structural Welder
Aerotek
10.2017 - 01.2018
Conveyor Installer
IMI Logistics
07.2015 - 04.2018
MIG Welder
Aerotek
10.2014 - 07.2015
Pipeline Laborer
Boots Smith Oilfield Services LLC.
07.2013 - 08.2014
Some College (No Degree) - Welding Technology
University of New Mexico
Some College (No Degree) - Construction Management
University of Phoenix
Similar Profiles
Jose CortezJose Cortez
Supervisor of Distribution Operations at Dematic CorpSupervisor of Distribution Operations at Dematic Corp