Dedicated Pipefitter with background in job coordination and worksite setup. Knowledgeable in safety processes, regulations and pipe selection. Offering successful career history comprising more than 6 years.
Overview
9
9
years of professional experience
Work History
Pipefitter
Conner Industries
03.2020 - Current
Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
Threaded pipes using piping machines.
Followed safe work practices, which included fall protection and personal protective equipment.
Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
Pipefitter
Mcdyees Inc.
02.2018 - 03.2020
Increased efficiency by collaborating with team members to install, assemble and repair piping systems in various construction projects.
Enhanced safety by conducting regular inspections of tools and equipment, ensuring proper maintenance and functionality.
Reduced project completion time by interpreting blueprints, sketches, and specifications to accurately plan pipefitting installations.
Equipment Operator
West Texas Utilities
09.2015 - 01.2018
Increased equipment efficiency by performing regular maintenance and timely repairs.
Ensured safe working environment through adherence to safety guidelines and protocols for equipment operation.
Maximized productivity with efficient scheduling and allocation of equipment resources.
Contributed to project completion, skillfully operating various heavy machinery such as excavators, bulldozers, and loaders.
Assisted in training new operators, providing guidance on proper equipment usage and safety procedures.
Maintained accurate records of equipment performance and service history for future reference and analysis.
Operated range of heavy equipment on regular basis with advanced skill.
Education
High School Deploma -
Dumas High School
Dumas, TX
05.2008
Skills
Blueprint Analysis
Safety Procedures
Hand and power tools
Installation and maintenance
Pipe Hanger Installation
Flange Assembly
Effective Communication
Hand and Power Tool Operation
Timeline
Pipefitter
Conner Industries
03.2020 - Current
Pipefitter
Mcdyees Inc.
02.2018 - 03.2020
Equipment Operator
West Texas Utilities
09.2015 - 01.2018
High School Deploma -
Dumas High School
Similar Profiles
Cesar OrtizCesar Ortiz
Material Handler & Shipping/Receiving at Conner IndustriesMaterial Handler & Shipping/Receiving at Conner Industries