Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Mark Hall

Diamondhead,United States

Summary

Safety-conscious employee known for effectively communicating with team members and remaining attentive while working in high-risk environments. Dependable and hard-working with multi-craft experience of more than 19 years in the construction industry. Thrives in a fast-paced environment and works to complete projects quickly and efficiently. Excellent attendance record and stamina to perform strenuous labor. Personable, used to working outdoors and promoting operating dangerous equipment safely. Adaptable to all types of situations and works productively with different personalities.

Overview

20
20
years of professional experience
1
1
Certification

Work History

Ironworker Foreman

GA West
02.2024 - Current

AM/NS Fluor Gator Project

  • Complied with OSHA and company safety guidelines for height safety, lock out tag out, confined space, and hazardous material handling.
  • Prioritized safety across job site with specific attention to load suspension, welding, and cutting.
  • Elevated team morale by fostering a positive work environment focused on collaboration, open communication, and mutual respect.
  • Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
  • Erected structural steel and iron frameworks for buildings

Pipe General Foreman

Overland Contracting
10.2022 - 02.2024

Cavendish Green Hydrogen Project

  • Enhanced safety standards on job sites by conducting regular inspections, enforcing protocols, and providing ongoing training for crew members.
  • Prepared and submitted reports on job progress and safety conditions to upper
  • Enforced safety regulations, procedures and standards for construction.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Coordinated with other trades on-site to ensure seamless integration of piping systems within the overall construction project scope.
  • Collaborated with project managers to develop detailed work plans, schedules.
  • Fostered a positive work environment by promoting teamwork, recognizing achievements, and addressing conflicts in a timely manner.
  • Inspected equipment and tools used for safe operation.

Pipe Foreman

Overland Contracting
07.2022 - 10.2022

Florida City Gas Miami- Safe LNG project

  • Supervised layout, assembly and installation of various sizes and types of piping systems.
  • Led a highly motivated team that consistently met or exceeded performance expectations while maintaining a positive working environment conducive to collaboration and continuous learning.
  • Ensured accurate documentation of all completed work, including detailed records of materials used, labor hours logged, and any changes made during the course of the project.
  • Improved overall job site safety by enforcing strict adherence to safety guidelines and conducting regular hazard assessments.
  • Inspected equipment and tools used for safe operation.
  • Administered disciplinary actions to workers violating safety regulations and company policies.

Ironworker Foreman

Overland Contracting
05.2021 - 06.2022

Crist Reliability Project

  • Complied with OSHA and company safety guidelines for height safety, lock out tag out, confined space, and hazardous material handling.
  • Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.
  • Maneuvered and positioned support structures before and after pouring concrete, often manipulating iron by cutting, welding, or bending.
  • Prioritized safety across job site with specific attention to load suspension, welding, and cutting.
  • Erected structural steel and iron frameworks for buildings and other structures.

Rigging Supervisor

Wood Group
09.2018 - 04.2021

YCI Methanol Project

  • Enhanced crew efficiency through clear communication and collaboration with team members.
  • Championed safety culture within the team by being a role model for safe working practices and encouraging open dialogue about potential safety concerns.
  • Ensured compliance with OSHA regulations through diligent monitoring of team adherence to safety protocols.
  • Managed scheduling and planning of rigging activities, optimizing resource allocation across multiple projects.
  • Coordinated with crane operators to ensure accurate lifts, enhancing project completion rates.
  • Implemented preventative maintenance programs for rigging equipment, reducing repair costs over time.
  • Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.
  • Documented construction and extraction workers' hours, wages and other pertinent information.
  • Ensured proper load distribution during lifting operations, minimizing the risk of accidents.
  • Improved rigging safety by conducting regular equipment inspections and maintenance.
  • Trained junior riggers in industry best practices for safe and efficient operations.
  • Conducted thorough risk assessments prior to commencing any work activities, mitigating potential workplace hazards.

Boilermaker Foreman

Saulsbury Industries
09.2017 - 08.2018

Cabot Canal Plant

  • Increased overall productivity with efficient delegation of tasks to appropriate personnel.
  • Maintained strict compliance with OSHA regulations, company policies, and industry best practices throughout all projects undertaken.
  • Monitored safety compliance to maintain strict standards and protect team members from harm.
  • Inspected completed work to ensure adherence to quality standards before finalizing handover processes with clients or stakeholders.
  • Led safety meetings to educate workers on proper protocols, minimizing workplace hazards and injuries.
  • Enhanced project efficiency by supervising and coordinating the work of boilermaker crews.
  • Conducted regular performance evaluations for team members, providing constructive feedback for professional growth.
  • Resolved on-site issues promptly by addressing concerns and implementing corrective actions as needed.
  • Interpreted blueprints, sketches, and specifications for each job.

Pipe General Foreman

Fluor
09.2016 - 05.2017

Overview: Citrus County Combined Cycle Project

  • Enhanced safety standards on job sites by conducting regular inspections, enforcing protocols, and providing ongoing training for crew members.
  • Managed a crew of up to 40 people in the safe work practices, fabrication, installation and testing of underground and above ground pipe
  • Some responsibilities were ensuring safety policies and procedures followed, reading drawings, communicating with other crafts, overseeing hydro and pneumatic testing of pipe, and ensuring quality of work
  • Conducted regular performance evaluations for team members, identifying strengths weaknesses opportunities for improvement.
  • Coordinated with other trades on-site to ensure seamless integration of piping systems within the overall construction project scope.
  • Conducted thorough pre-construction reviews of drawings and specifications to identify potential issues before they impacted project progress or budget.
  • All work was done while keeping crew and others safe

Boilermaker

Thompson
02.2016 - 05.2017
  • Company Overview: Marshall Steam Station Mooresville, NC
  • Installed platforms, demolished old water wall tube panels, installed new tube panels, and fit external boiler supports
  • Milled and prepped tubes using mill hog
  • Measured and cut supports for boiler and installed supports on location
  • Demolished old support and tubes using torch and high speed cutting wheels
  • Marshall Steam Station Mooresville, NC

Boiler Maker/ Pipe Foreman

Saulsbury Industries
01.2015 - 02.2016
  • Company Overview: Fabricated Bag House for Welsh Power Plant Pittsburg, TX
  • Led a crew of 15 men in successfully completing project on time
  • Used drawings to fabricate and check correctness of installation
  • Positioned duct work on iron using rigging and flagging crane
  • Installed slide and guided plates for growth and support
  • Once duct work was installed moved the pipe installation and fabrication led a crew of 15 in installation and fabrication of pipe
  • Maintained safety and quality while keeping production on time
  • Fabricated Bag House for Welsh Power Plant Pittsburg, TX

Boilermaker

Thompson
08.2014 - 01.2015
  • Company Overview: Marshall Steam Station Mooresville, NC
  • Installed platforms, demolished old water wall tube panels, installed new tube panels, and fit external boiler supports
  • Milled and prepped tubes using mill hog
  • Measured and cut supports for boiler and installed supports on location
  • Demolished old support and tubes using torch and high speed cutting wheels
  • Marshall Steam Station Mooresville, NC

Expediter/ Pipe Foreman

G.A West
07.2013 - 08.2014
  • Fabricated Cold boxes
  • Expediter duties included unloading and loading of trucks, delivering materials with jockey truck, operating variable boom forklift, checking invoices and managing inventory, and maintain paper work for inventory
  • As an foreman I lead a team of 8 men
  • We assembled pipe spools which included rigging and positioning of pipe
  • I used drawings to assemble pipe spools and check for correct installation of valves and supports

Boilermaker

Irwin
02.2013 - 06.2013
  • Installed platforms, demolished old tube panels, installed new tube panels, and fit pipe supports
  • Bull rigged and bolted up iron to build new platforms
  • Milled and prepped tubes using mill hog
  • Measured and cut supports for pipe
  • Installed supports on location
  • Demolished old piping and tubes using torch and high speed cutting wheels

Pipe Rigger/Fitter

CBI
09.2012 - 02.2013
  • Job responsibilities included rigging and flagging of material with crane and bull rigging pipe to location
  • Cut, beveled and fit pipe
  • Used torqued wrenches to tighten bolts correctly and installed valves
  • Applied underground coating to pipe and checked for defective spots using jeeping device

Pipe Rigger/Fitter

Fluor
05.2010 - 05.2012
  • Company Overview: Fabricated S.C.R units plant Scherer Power Plant in Juliette, Ga
  • Job responsibilities included rigging and flagging of material with crane and bull rigging pipe to location
  • Cut, beveled and fit pipe
  • Used torqued wrenches to tighten bolts correctly and installed valves
  • Part of team that pressure checked pipe for leaks
  • Fabricated S.C.R units plant Scherer Power Plant in Juliette, Ga

Expediter, Rigging Lead Man

G.A. West
08.2009 - 05.2010
  • Company Overview: Fabricated buildings and equipment at T.K
  • Steel mill Calvert, Al
  • Expediter duties included unloading and loading of trucks, delivering materials with jockey truck, operating variable boom forklift, checking invoices and managing inventory, and maintain paper work for inventory
  • As a rigging lead man I managed a group of five men in setup, maintenance and operation of spider scaffolding
  • Also rigged and flagged material using crane
  • Fabricated buildings and equipment at T.K
  • Steel mill Calvert, Al

Boilermaker

PMSI
08.2008 - 05.2009
  • Fabricated JBR Units for power plant in Topeka, KS
  • Job duties included torch cutting metal, fitting of duct work, rigging of duct work, and light welding(tacking) of ductwork
  • Positioned duct work on iron and installed guide plates in correct locations

Boilermaker

O.C.I
06.2007 - 05.2008
  • Fabricated S.C.R Units for power plant in Leroy, AL
  • Job duties included torch cutting metal, fitting of duct work, rigging of duct work, and light welding(tacking) of ductwork
  • Installed filter catalyst baskets in S.C.R
  • Unit and removed old duct to make connections for new duct

Iron worker, millwright

G.A. West
04.2005 - 06.2007
  • Demolished old building damaged in hurricane and replaced with new building
  • Job duties included hanging, rigging and bolting up iron beams
  • Operating a forklift and torch cutting
  • During this time I worked several shutdowns at the Armstrong tile plant in Mobile, AL
  • Changed out bearings and made other repairs to the plant

Education

Bachelor of Science - Computer Science

University Southern Mississippi
Hattiesburg, MS
01.2004

Associate of Science - Computer Science

Pearl River Central Community College
Poplarville, MS
01.2001

High School Diploma - General

Hancock High School
Kiln, MS
01.1999

Skills

  • OSHA Certified 10hr
  • OSHA Certified 30hr
  • NCCER Advanced Certified
  • Boilermaker journeyman
  • Expert in crane rigging
  • Expert bull rigging pipe
  • Expert Pipe Fitter
  • Construction machinery operation
  • Blueprint reading

  • Excellent driving record
  • Strong communication skills
  • Detail-oriented
  • Friendly and hardworking
  • Leadership
  • Exceptional problem solver
  • Well educated
  • Steel Erection
  • Crane Signaling

Certification

  • OSHA 30 hour safety
  • OSHA 10 hour Safety
  • Nccer Advanced Rigging Certification

Timeline

Ironworker Foreman

GA West
02.2024 - Current

Pipe General Foreman

Overland Contracting
10.2022 - 02.2024

Pipe Foreman

Overland Contracting
07.2022 - 10.2022

Ironworker Foreman

Overland Contracting
05.2021 - 06.2022

Rigging Supervisor

Wood Group
09.2018 - 04.2021

Boilermaker Foreman

Saulsbury Industries
09.2017 - 08.2018

Pipe General Foreman

Fluor
09.2016 - 05.2017

Boilermaker

Thompson
02.2016 - 05.2017

Boiler Maker/ Pipe Foreman

Saulsbury Industries
01.2015 - 02.2016

Boilermaker

Thompson
08.2014 - 01.2015

Expediter/ Pipe Foreman

G.A West
07.2013 - 08.2014

Boilermaker

Irwin
02.2013 - 06.2013

Pipe Rigger/Fitter

CBI
09.2012 - 02.2013

Pipe Rigger/Fitter

Fluor
05.2010 - 05.2012

Expediter, Rigging Lead Man

G.A. West
08.2009 - 05.2010

Boilermaker

PMSI
08.2008 - 05.2009

Boilermaker

O.C.I
06.2007 - 05.2008

Iron worker, millwright

G.A. West
04.2005 - 06.2007

Associate of Science - Computer Science

Pearl River Central Community College

High School Diploma - General

Hancock High School
  • OSHA 30 hour safety
  • OSHA 10 hour Safety
  • Nccer Advanced Rigging Certification

Bachelor of Science - Computer Science

University Southern Mississippi
Mark Hall