Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Martin Rodriguez

Jacksonville,FL

Summary

Adept at enhancing construction project outcomes, I leveraged site inspection and team-building skills at Corbitt Site Construction to significantly improve efficiency and safety standards. My proactive approach to material procurement and employee training ensured projects met strict timelines, with a notable increase in team productivity and project quality.

Overview

13
13
years of professional experience

Work History

Job Site Supervisor

Corbitt Site Construction
11.2022 - Current
  • Improved construction project efficiency by implementing effective scheduling and resource allocation strategies.
  • Managed budgets effectively, minimizing expenses without compromising on quality or timelines of deliverables.
  • Trained junior staff members in relevant skills to ensure the efficient running of the job site operations.
  • Coordinated onsite activities for effective execution of tasks while maintaining strict quality standards.
  • Ensured timely completion of projects by closely monitoring progress and addressing potential delays proactively.
  • Monitored inventory levels regularly to avoid material shortages that could lead to project delays or cost overruns.
  • Maintained records and logs of work performed and materials and equipment.
  • Provided onsite training to help develop employee skills.

Pipe Foreman

Pipeline Contractors Inc
03.2018 - 11.2022


  • Supervised layout, assembly and installation of various sizes and types of drainage pipes.
  • Assembled and secured pipes, tubes, fittings and related equipment according to project specifications.
  • Achieved cost savings through diligent budget management and accurate estimation of required resources for each project phase.
  • Increased crew productivity through regular training sessions on safety protocols and industry best practices.
  • Optimized resource allocation by effectively managing equipment, materials, and personnel for multiple projects simultaneously.
  • Delivered exceptional results under tight deadlines by prioritizing tasks, delegating responsibilities, and overseeing all aspects of pipe installation projects from start to finish.
  • Led a highly motivated team that consistently met or exceeded performance expectations while maintaining a positive working environment conducive to collaboration and continuous learning.
  • Reviewed and approved employee time reporting.

Quality Control Inspector

Blattner Energy
02.2017 - 03.2018

•Inspected the mechanical build of the 74.9 MW AC. fix arrays systems.Verifying tolerances, racking,and mounting placements within torque values, And finally verified PV module placements in accordance to engineering design specifications.

• Understanding of state regulated SWPPP program and guidelines. Adherence to the implementation

of BMPs throughout the project. Creating temporary and permanent stabilization, preventing

major erosion, unplanned retention areas or any environmental impacts.

Pipe Layer

Kt Carter Contractors Inc
08.2013 - 02.2017
  • Enhanced workplace safety by consistently following standard operating procedures and wearing appropriate personal protective equipment.
  • Handled all repairs for sanitary and storm water sewer structures and pipe systems.
  • Demonstrated strong problem-solving abilities by addressing unexpected complications during pipe installation processes.
  • Observed all safety measures and company equipment policies to prevent job site accidents.
  • Sustained positive working relationships with subcontractors, inspectors, and other stakeholders through effective communication skills.
  • Improved project efficiency by accurately measuring, cutting, and joining pipes for various construction projects.
  • Reduced project delays by promptly identifying and resolving issues with pipe alignment and connections.
  • Boosted productivity by efficiently using hand tools such as pipe cutters, wrenches, and shovels in pipe laying.
  • Assembled and installed underground pipe, fittings, and valves of various sizes.
  • Used hand signals to direct equipment operators and alert to hazards.

Pipe Layer

Pipeline Contractors Inc
11.2011 - 08.2013
  • Assembled and installed underground pipe, fittings, and valves of various sizes.
  • Used hand signals to direct equipment operators and alert to hazards.
  • Enhanced workplace safety by consistently following standard operating procedures and wearing appropriate personal protective equipment.
  • Handled all repairs for sanitary and storm water sewer structures and pipe systems.

Education

General -

Keystone Heights High School
Keystone Heights, FL
05.2010

Skills

  • Site Inspection
  • Task Delegation
  • Material Procurement
  • Environmental awareness
  • Subcontractor Management
  • Maintenance Coordination
  • Construction supervision
  • Construction safety
  • Site coordination
  • Site Safety
  • Field Inspection
  • Technical knowledge
  • Personnel Oversight
  • Problem-solving abilities
  • Following Instructions
  • Multitasking
  • Excellent Communication
  • Organizational Skills
  • Hand and Power Tool Operation
  • Heavy equipment operations
  • Site Maintenance
  • Team building
  • Employee Training
  • Blueprint Reading

Languages

Spanish
Native or Bilingual

Timeline

Job Site Supervisor

Corbitt Site Construction
11.2022 - Current

Pipe Foreman

Pipeline Contractors Inc
03.2018 - 11.2022

Quality Control Inspector

Blattner Energy
02.2017 - 03.2018

Pipe Layer

Kt Carter Contractors Inc
08.2013 - 02.2017

Pipe Layer

Pipeline Contractors Inc
11.2011 - 08.2013

General -

Keystone Heights High School
Martin Rodriguez