Summary
Overview
Work History
Education
Skills
Additional Information
Certification
Timeline
Generic

Marwan Abdelbaki

Section Manager / Asphalt Manager
Doha ,DA

Summary

To obtain a suitable position as a section manger with strong practical and technical skills emerging from range of experiences in construction of roads, infrastructure, tunnels, bridges, landscape and pavement that satisfies my personal ambition and improves my knowledge

Overview

2
2
Languages
4
4
Certifications
5
5
years of post-secondary education
3
3
years of professional experience

Work History

Section Manager/ Asphalt Manager

QD-SBG
doha , Qatar
08.2019 - present
  • Schedule weekly section meetings to review emerging challenges, identify opportunities and recognize high-performing employees.
  • Coordination between all stakeholders like (Qrail , QF- amiri’s guard, interface and intersection points related to governmental projects).
  • Leading section consists of (04 engineers & 05 general foreman & 3 foreman & 270 labour, 70 heavy equipment) and many specialist subcontractors. .
  • Leading asphalt team consists of ( asphalt engineer,Asphalt superintendent,06 asphalt foreman,08 screed man and 70 labor) in addition to the asphalt equipment (05 pavers ,10 PTR,08 steel roller, ...Etc) and operators.
  • Reporting directly to project manager and project director.
  • Following up execution of all site activities as per the agreement with the client.
  • Executing all pavement works in 02 project belongs to the company (Dukhan road project P005 and Lusail project CP-07B).

Project Engineer

QD-SBG
doha , Qatar
05.2018 - 08.2019
  • Leading group consists of ( 02 civil engineer, 03 general foreman, 11 Foreman and around 270 labor).
  • Responsible for all infrastructure, roadworks, landscape and structural works in my scope that was around 2.5 Km long.
  • Linked point between the site and the management directives in construction of (highway, asphalt, bridges, tunnels, asphalt, infrastructure).
  • Liaising with consultants, planners, quantity surveyors and general workforce involved in project.

Civil Engineer

QD-SBG
doha , Qatar
04.2017 - 05.2018
  • All civil works related to infrastructure and utilities.
  • Roadworks construction and preparation for pavement.
  • Formwork for tunnels, bridges and substations.
  • Concrete pouring for walls,rafts and all structural items.
  • Leading group consisted from ( 02 general foreman, 07 foreman and 155 labor )
  • Liaise with civil technicians to prepare and update maps, drawings and blueprints using manual and computer-assisted methods.
  • Use MS Project to effectively track permits and change order requests.
  • Preparation of all required documents for inspection.
  • Control engineering activities to maintain work standards, adhere to timelines and meet quality assurance targets.
  • Inspect project sites to monitor progress and adherence to design specifications, safety protocols and state sanitation standards.
  • Inspect installation of precast structures, underground services, concrete and earthworks.

Civil Engineer

Marasi Estates Investment Co
ALsharkia, Egypt
06.2016 - 04.2017
  • Monitor execution of contract work for compliance with design plans and specifications.
  • Execute Construction of main road linked between two major cities with length 21 Km consisted from 03 lanes in each direction and upgrading the existing frontage roads.
  • Analyze survey reports, maps, blueprints and other topographical and geologic data to effectively plan infrastructure and construction projects.
  • Assess construction and demolition operations for compliance with safety rules and environmental regulations.
  • Control engineering activities to maintain work standards, adhere to timelines and meet quality assurance targets.
  • Establish and implement construction schedules, methods, equipment and labor requirements, using Gantt charts and MS Project.

Education

Bachelor of Engineering - Civil Engineering-construction Division

El-Shorouk Academy
Cairo, Egypt.
05.2011 - 05.2016

Skills

Managerial skills

undefined

Additional Information

o Project undertaken:

* Title: Khaliva Avenue – Dukhan Road project (east contract).

- Client: Ashghal.

- PMC: KBR.

- Supervising consultant: Parsons international limited.

- Design: Dar El-Hadassah.

- Project value: QR 07 billion.

-Designation: section manager/asphalt manager for (highway, structural, MEP, asphalt, infrastructure).


* Title: CP07B Lusail Plaza, Infrastructure Works, LRT Station, Public Car Parks & Landscape.

- Client: Qatar Diar.

- PMC: Parsons international limited.

- Supervising consultant: Dorsch Qatar.

- Design: Dar El-Hadassah.

- Project value: QR 4.2 billion.

-Designation: asphalt manager/section manager

Certification

UPDA

Timeline

Section Manager/ Asphalt Manager

QD-SBG
08.2019 - present

Project Engineer

QD-SBG
05.2018 - 08.2019

Civil Engineer

QD-SBG
04.2017 - 05.2018

Civil Engineer

Marasi Estates Investment Co
06.2016 - 04.2017

Bachelor of Engineering - Civil Engineering-construction Division

El-Shorouk Academy
05.2011 - 05.2016
Marwan Abdelbaki Section Manager / Asphalt Manager