Professional Summary
Overview
Work History
Education
Skills
Timeline

Mary Seymore

Nautique Boat Company
Killeen,TX
25
years of professional experience

Results-driven Glass Laminator with extensive experience at Nautique Boat Company, recognized for enhancing production efficiency and reducing waste by implementing innovative techniques. Proficient in precision glass cutting and quality control, while fostering teamwork and mentoring new employees to uphold safety standards and operational excellence.

Work History

Glass Laminator /Lead

25 Years 3 Months
Nautique Boat Company | 04.1997 - 07.2022
  • Operated laminating equipment to produce high-quality glass components.
  • Ensured compliance with safety protocols during production processes.
  • Assisted in quality inspections to maintain product standards.
  • Collaborated with team members to streamline workflow efficiency.
  • Trained new employees on laminating techniques and safety procedures.
  • Maintained clean and organized workspaces to support operational excellence.
  • Implemented process improvements that reduced material waste during production.
  • Assisted in the development of training materials for new employees, promoting consistent quality standards across the team.
  • Implemented cost-saving measures by efficiently utilizing raw materials and minimizing waste during production processes.
  • Reduced waste by diligently inspecting glass materials for defects and imperfections prior to lamination.
  • Optimized production efficiency by maintaining clean and organized workstations, ensuring smooth workflow throughout the process.
  • Ensured safety compliance by following appropriate protocols during handling, cutting, and assembling processes.
  • Enhanced the overall aesthetic appeal of laminated glass products by skillfully applying decorative interlayers and finishes.
  • Contributed to team success through active collaboration and sharing best practices for glass lamination techniques.
  • Exhibited strong attention to detail while measuring, cutting, and aligning layers of glass accurately for successful lamination results.
  • Proactively identified potential issues during the lamination process and implemented corrective measures to ensure product integrity.
  • Trimmed cured materials by sawing with diamond-impregnated cutoff wheels.
  • Released air bubbles and smoothed seams using rollers.
  • Pressed layers of saturated mat or cloth into place on molds, using brushes, or hands.
  • Sprayed chopped fiberglass, resins and catalysts onto prepared molds or dies, using pneumatic spray guns with chopper attachments.
  • Bonded wood reinforcing strips to deck cabin structures, using resin-saturated fiberglass.

Crew Leader

2 Years 6 Months
Q4 Services | 01.2011 - 07.2013
  • Supervised daily operations, ensuring team adherence to safety protocols and standards.
  • Coordinated workflow assignments, optimizing productivity across crew members.
  • Trained new staff on equipment usage and operational procedures to enhance efficiency.
  • Implemented process improvements, reducing waste and increasing overall performance quality.

Production Worker

5 Years 2 Months
Cinnabar, Orlando Florida | 04.1999 - 06.2004

Boat builder crew leader and safety captain

Education

GED

Winter Park Hi | Winter Park, FL | 06-1973

Skills

Workplace cleanliness
Hand tool proficiency
Measurement accuracy
Machine operation
Precision glass cutting
Production scheduling
Glass lamination techniques
Power tool operation
Mold preparation
Training and mentoring
Workshop organization
Quality control inspection
Environmental awareness
Surface finishing
Waste reduction
Resin application
Fiberglass repair
Teamwork
Grinding skills
Teamwork and collaboration
Problem-solving
Attention to detail
Worksite safety
Multitasking Abilities
Reliability
Work order completion
Critical thinking
Active listening
Effective communication
Material handling
Decision-making
Relationship building
Safety procedures
Team building
Safety protocols
Material cutting
Self motivation
Blueprint reading
Goal setting
Quality control
Painting skills
Equipment maintenance
Material inspection
Fiberglass installation
Gelcoat application
Fiberglass molding
Lay-up processes
Fabrication techniques

Timeline

Crew Leader

Q4 Services
01.2011 - 07.2013Read More

Production Worker

Cinnabar, Orlando Florida
04.1999 - 06.2004Read More

Glass Laminator /Lead

Nautique Boat Company
04.1997 - 07.2022Read More

Winter Park Hi

GED
Read More
Mary Seymore