Union Laborer
Northern Pipeline Construction
04.2017 - Current
- Excavated trenches for installation and maintenance of natural gas lines
- Performed preventative and emergency maintenance on existing leaking gas lines
- Install required trench shoring to maintain safe working conditions
- Used jackhammers and concrete saws to break apart concrete surfaces for removal
- Worked closely with large excavating equipment in order to expose and maintain underground utilities
- Repair and reroute underground sewers and build catch basins
- Organize and maintain traffic safety for work performed in roadways
- Operate Dot vehicles such as work trucks and dump trucks
- Frame, pour, and finish concrete to original specifications after removal and completion of prior task
- Maintain safe and clean worksite.