A Leader that can manage multiple craft labor crews on projects. I will effectively work with both field staff and Engineering teams to bring about innovative and safe solutions on construction projects.
Overview
17
17
years of professional experience
Work History
General Foreman
American Bridge Company
Seattle, WA
06.2020 - Current
Communicated regularly with team members about changes in scope or schedule.
Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
Collaborated with engineers and architects on design modifications when necessary.
Planned and managed manpower and resource requirements to support project activities.
Resolved conflicts between workers regarding job assignments, methods, or deadlines.
Maintained accurate records of daily operations including time cards, production data logs.
Directed the activities of subcontractors to ensure quality workmanship and adherence to contract specifications.
General Foreman
DCCI
Shakopee, MN
10.2014 - 02.2022
Responsible for the financial performance of the work including production rates, logistics for each crew, material availability and pre-work planning
Enforced project safety guidelines and procedures
Responsible for quality control over supervised work including inspections and presenting to the General Contractors the final work product for review and acceptance
Manage shipping and receiving with local vendors
Responsible for oversight of subcontractors including F.D. Thomas and Pen Hall
Responsible for scheduling self-performed and subcontracted work for a timely completion of the project
Managing Iron Worker Forman and multiple crews and providing a safe work site
Foreman
DCCI
04.2013 - 10.2014
Manage Iron Workers and multiple crews
Schedule, organize and plan job duties and goals
Enforce safety guidelines and procedures
Receiving, and offloading of cargo
Foreman
American Bridge Company
Oakland , Ca
03.2007 - 04.2013
Receiving, offloading, shake-out, transport to site, rigging, erection and bolt up of 35,000 MT of temporary false work which provided temporary support for the Orthotropic Bridge Deck (O.B.D)
Receiving, offloading of the cargo ship, transport to site via barge, erection, bolt-up and welding associated with the permanent O.B.D
Oversaw crews performing the Load Transfer of the O.B.D temporary false work to the Permanent Cable System