Matthew Colligan

Project Manager, MBA
New Orleans,LA

Overview

16
16
years of professional experience
2
2
years of post-secondary education

Work History

Fleet Manager

Caterpillar
09.2022 - Current
  • Responsible for Fleet Management of key customer assets of Edison Chouest Offshore.
  • Assist with engine overhaul planning for 2,500+ caterpillar assets to include scope management, parts planning and execution.
  • Facilitate failure analysis of engines to determine root causes. Engage Caterpillar dealers and internal engineering resources to review material issues, workmanship, and failure modes.
  • Support 66 assets which are remote monitored 24/7 by Caterpillar CORE Team. Review alarms and indicators and provide analysis to prevent engine failure before occurring.


Project Manager II

Kinder Morgan
01.2020 - 09.2022
  • Managed a $10M expansion for bulk chemical storage to increase product throughput. Included new river dock lines, two 25K BBL tank additions, rail loading modifications, automated truck loading, and 3K barrels/month of drumming operations.
  • Converted 35,000 BBL storage tank into chemical service. Designed, selected, and managed installation of pump and piping system, overfill protection, vapor recovery, heat and insulation systems, and truck/rail loading controls integration.
  • Procured and installed a truck scale with personnel fall protection for automated loading of MDI product from tank to truck.
  • Oversaw design of a new 700 foot rail spur from mainline into terminal along with associated loading personnel fall protection equipment to increase rail throughput.

Engineering Project Manager

Kellogg Brown and Root
07.2019 - 10.2019
  • Supported redevelopment of a new central oil processing facility located in Algeria through BED and FEED design.
  • Developed progress reports to calculate earned value and productivity of engineering man hours for monthly client billing.
  • Ensured project deliverables meet and exceed contract specifications.
  • Daily review of engineering documents (P&ID, PFD, UFD) for adherence to company and customer standards.
  • Manage division of work for each engineering discipline between London and Chennai offices.
  • Coordinated with engineering leads to determine upcoming work and the necessary resources needed to complete on time.

Project Manager

Kinder Morgan
04.2014 - 09.2018
  • Designed shore tank and river dock piping systems to meet API guidelines for low pressure above ground liquid storage tanks (5,000-200,000 BBL) in order to receive product by ship, and unload via tanker truck, rail car, and ISO containers.
  • Provided Engineering estimates for new business development opportunities.
  • Managed third party contracting crews on a daily basis to ensure safety and performance.
  • Created and updated all tank and terminal piping diagrams in AutoCAD.
  • Managed $2M project for renewable fuels to include 70K BBLS of product storage and transfer capabilities.


Vessel Planning & Repair Manager

American Commercial Barge Line
11.2011 - 04.2014
  • Successfully managed a $25 million dollar annual capital maintenance and repair budget.
  • Developed cost metrics to illustrate actual spend to budget variances by vendor and/or shipyard.
  • Managed a mechanical and electrical maintenance crew of four.
  • Created detailed scopes of work for all vessel shipyard overhauls.
  • Oversaw new vessel construction project for multiple 2,000HP vessels equipped with azimuth style thrusters.
  • Repaired a 2,000HP mainline crew vessel that had a problematic vibration issue that saved over $100k in dry-docking repairs.
  • Responsible for propeller specification program by utilizing HydroComp software.

Industrial Engineer

Huntington Ingalls Industries
11.2008 - 11.2011
  • Responsible for supporting the Earned Value Management System in the Hull and Pipe divisions on all LPD ship projects. Tracked each project by department and phase.
  • Analyzed hull unit manufacturing work plans in order to increase efficiency by 15% from unit to unit.
  • Advised ship managers how to utilize headcount in order to meet production and budget goals across multiple crafts.
  • Performed the annual Industrial Engineering Point Estimate for Hull and Pipe divisions. Evaluated remaining work-orders per ship, and determined the hours it would take to complete them based on standards, history, and learning curve trends.

Education

Master of Business Administration - Innovation Management

Temple University
Philadelphia, PA
08.2018 - 09.2020

Bachelor of Science - Industrial Technology

Purdue University
West Lafayette, IN
09.2004 - 5 2008

Timeline

Fleet Manager

Caterpillar
09.2022 - Current

Project Manager II

Kinder Morgan
01.2020 - 09.2022

Engineering Project Manager

Kellogg Brown and Root
07.2019 - 10.2019

Master of Business Administration - Innovation Management

Temple University
08.2018 - 09.2020

Project Manager

Kinder Morgan
04.2014 - 09.2018

Vessel Planning & Repair Manager

American Commercial Barge Line
11.2011 - 04.2014

Industrial Engineer

Huntington Ingalls Industries
11.2008 - 11.2011

Bachelor of Science - Industrial Technology

Purdue University
09.2004 - 5 2008
Matthew ColliganProject Manager, MBA