Summary
Overview
Work History
Education
Skills
Timeline
Generic

Matthew Key

Locust Grove,GA

Summary

Adept at enhancing project efficiency and quality, My tenure at McKenney's showcased My ability to streamline fabrication processes and foster team growth. Skilled in BIM coordination and effective communication, I significantly improved productivity and safety standards, demonstrating a keen aptitude for both technical and leadership roles. With experience in the field and drafting i was able to understand both sides of the the construction process. My QAQC experience also offered insight into construction standards and constructability of duct systems as they relate to other MEP trades

Overview

25
25
years of professional experience

Work History

Sheet Metal Foreman

Mckenneys
01.2010 - Current
  • Ensured timely project completion by closely monitoring progress and adjusting resources as needed.
  • Facilitated smooth transitions between project phases by maintaining clear communication channels among team members, management, and clients.
  • Streamlined fabrication processes for improved productivity by introducing more efficient cutting and welding techniques.
  • Enhanced workplace safety by implementing strict safety protocols and conducting regular equipment inspections.
  • Increased overall project efficiency by effectively delegating tasks and managing a team of sheet metal workers.
  • Mentored junior staff members on industry best practices, fostering professional growth within the team.
  • Coordinated with other trades on the job site to ensure seamless workflow, avoiding delays or conflicts in scheduling.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Checked equipment to determine if maintenance was required.
  • Oversaw loading and unloading of packages in warehouse.

Virtural Construction

McKenney's
04.2021 - 11.2024
  • Increased client satisfaction by delivering high-quality workmanship and addressing concerns promptly.
  • Adapted project plans to accommodate unforeseen changes in site conditions, client requests, or regulatory requirements ensuring a smooth construction process.
  • Maintained high safety standards on construction sites, resulting in fewer accidents and injuries.
  • Collaborated with architects, engineers, and subcontractors to develop comprehensive plans for successful projects.
  • Enhanced project efficiency by streamlining construction processes and implementing time-saving techniques.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.

Qaqc

McKenney's
02.2015 - 02.2016
  • Improved product quality by implementing rigorous QAQC processes and procedures.
  • Facilitated internal audits to assess compliance with company policies and procedures, uncovering areas for improvement and ensuring alignment across departments.
  • Conducted thorough inspections for adherence to project specifications, resulting in reduced defects and increased customer satisfaction.
  • Reviewed and approved engineering change requests, ensuring that modifications maintained product quality and conformed to project specifications.
  • Reduced production errors by conducting root cause analysis and implementing corrective actions.

Sheet Metal Worker

BHW
08.2006 - 08.2009
  • Used rulers, squares and scribes to measure and mark dimensions and reference lines on materials.
  • Fastened joints and seams together to assemble components into sheet metal products.
  • Improved project efficiency by accurately measuring, cutting, and assembling sheet metal components.
  • Enhanced workplace safety through proper use of tools and equipment during fabrication tasks.
  • Completed projects on time by effectively prioritizing tasks and maintaining focus on work progress.
  • Performed quality finishes by trimming and deburring to create smooth surfaces and joints of assembled parts.
  • Reduced material waste with precise measurements and optimal layout planning for sheet metal cutting.

Ramp Agent

Delta Air Lines, Inc
08.1999 - 08.2008
  • Efficiently operated ground service equipment, such as tugs and belt loaders, to facilitate smooth handling of baggage and cargo.
  • Guided aircraft into and out of parking positions using hand signals.
  • Maintained clean ramps, preventing trip hazards or debris from interfering with aircraft movements or personnel safety.
  • Loaded and unloaded luggage and freight and assisted crew and travelers with bags.
  • Conducted marshaling activities skillfully, guiding pilots safely towards their designated parking positions on the ramp area.
  • Reduced damage claims by carefully handling sensitive cargo, adhering to proper lifting techniques and equipment use.
  • Contributed to a safer work environment by strictly following safety protocols during ramp operations.

Education

High School Diploma -

Mount Zion High School
Jonesboro, GA
06.1999

Skills

Stratus software

Construction Vehicles Operation

Revit software

Ductwork Installation

BIM coordination

Sheet metal layout

Layout Design

Sheet Metal Fabrication

Smart sheet

HVAC Systems

CAD Software

CAM Software

Timeline

Virtural Construction

McKenney's
04.2021 - 11.2024

Qaqc

McKenney's
02.2015 - 02.2016

Sheet Metal Foreman

Mckenneys
01.2010 - Current

Sheet Metal Worker

BHW
08.2006 - 08.2009

Ramp Agent

Delta Air Lines, Inc
08.1999 - 08.2008

High School Diploma -

Mount Zion High School
Matthew Key