Summary
Overview
Work History
Education
Skills
Certification
References
Timeline
Generic

Matthew Scruggs

Boiling Springs,SC

Summary

Flexible hard worker ready to learn and contribute to team success. Industrious Senior Site Manager versed in project, team and inventory management. Knowledgeable about operations and streamlining work and optimizing processes for maximum productivity. Seasoned Site Manager and talented problem solver with strong time management and technical abilities. Offering 12 years of experience in the field overseeing work, maintaining safety and improving operations. Knowledgeable leader with record of accomplishment on diverse construction projects. Translates directives of architects, constructions managers and clients into actionable on-site directives to consistently meet project demands. Expert in tackling problems head-on and maintaining strict standards.

Overview

13
13
years of professional experience
1
1
Certification

Work History

Senior Site Manager

KPI Solutions
Atlanta, GA
07.2022 - Current
  • Monitored worksite personnel to maintain high levels of quality and performance.
  • Maintained daily communication with subcontractors and inspectors to drive forward progress of project.
  • Maintained safe operating compliance and verified that operations met best practice standards.
  • Complied with operational standards and OSHA regulations.
  • Retained records of supplies and tools used and tasks performed for each project.
  • Interpreted blueprints and plans and relayed information to team of workers.
  • Inspected and evaluated physical condition of establishment to comply with safety, quality and service requirements.
  • Organized and participated in monthly on-site meetings with clientele and subcontractors.
  • Coordinated schedules of vendors and service providers to handle diverse operational and supply needs.
  • AutoStore project LT APPAREL Greensboro NC.
  • Built the 1st ASRS 4-way shuttle system in the USA. Union SC Mycowrks.
  • Performed routine audits to maintain inventories, supplies and equipment.
  • Directed site activities to drive smooth operations and achieve quality assurance metrics.
  • Identified, evaluated and selected subcontractors to ensure project success.
  • Developed and maintained relationships with clients, subcontractors and local authorities.
  • Implemented safety protocols and monitored compliance of all personnel on site.
  • Organized resources to maximize efficiency while minimizing costs.
  • Coordinated the scheduling of deliveries to meet production deadlines.
  • Conducted daily progress meetings with staff and subcontractors.
  • Resolved conflicts between workers in a timely manner.
  • Monitored quality control measures throughout the construction process.
  • Analyzed drawings, specifications and other documents for accuracy and completeness prior to commencement of work.
  • Prepared weekly reports detailing project activities, cost estimates and potential risks and issues for management review.
  • Supervised the preparation of job-site layouts for efficient use of space.
  • Provided technical advice on construction methods or procedures as required.
  • Performed periodic inspections of worksite conditions to identify any deficiencies or health and safety hazards.
  • Ensured compliance with applicable laws, regulations and codes pertaining to building construction practices.
  • Modified plans in response to delays, bad weather or construction site emergencies.
  • AutoStore Certified, Built LT APPAREL Greensboro NC, FMP Concord NC
  • ASRS certified built the 1st 4-way shuttle system in the United States MYCOWORKS Union SC.
  • AMR with advanced GEEK Robotic systems.

Site Superintendent

DH Griffin
Duncan, SC
10.2019 - 07.2022
  • Read blue prints.
  • Inspect bolts and torque values.
  • Check steel erection.
  • Inspect material delivered if damaged take pictures and record.
  • Inspect welds.
  • Ran a detail crew of 20 to fix problems that was wrong as project moved forward.
  • Communicate with other supervisors and clients for areas that need fixing
  • label print for areas done and signatures from clients.
  • Coordinated schedules and day-to-day activities of crew to satisfy project needs.
  • Assigned work to employees based on project requirements and individual team member strengths.
  • Conferred with other managers, technical personnel and team leaders to coordinate site work and maintain tight schedules.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Motivated and supported field workers completing work to increase work quality and team productivity.
  • Mazda Toyota QAQC Site Supervisor car plant AL.
  • Set conveyors switch gears, hanging conveyors, screen guard, lifters and battery shops.
  • Rivian Car plant set conveyors and pipe for Comau IL.
  • Organized and participated in monthly on-site meetings with clientele and subcontractors.
  • Communicated daily progress and incident reports to clients and corporate offices.
  • Resolved work issues and team conflicts to promote progress on complex projects.
  • Inspected daily construction to determine project progress, contract compliance and safety.
  • Supervised crew to facilitate top quality and achievement of project milestones.
  • Worked and set conveyors and robots in multiple car plants.
  • BMW set robots SC.
  • Mercedes eepos Rail and Seel work SC.
  • Volvo Steel work SC.
  • Complied with operational standards and OSHA regulations.
  • Interpreted blueprints and plans and relayed information to team of workers.
  • Maintained daily communication with subcontractors and inspectors to drive forward progress of project.
  • Safety Manager for 4 years.
  • Safety Job meeting and fundamentals of work site safety

Site Manager

Uni systems engineering
Minneapolis, MN
06.2015 - 10.2019
  • Monitored worksite personnel to maintain high levels of quality and performance.
  • Complied with operational standards and OSHA regulations.
  • Interpreted blueprints and plans and relayed information to team of workers.
  • Maintained daily communication with subcontractors and inspectors to drive forward progress of project.
  • Retained records of supplies and tools used and tasks performed for each project.
  • Modified plans in response to delays, bad weather or construction site emergencies.
  • Performed various job tasks in such areas as electrical, mechanical, plumbing and concrete work, keeping watchful eye on risks that could affect site safety.
  • Worked on retractable roofs for stadiums to perform maintenance.
  • Site Manager Atlanta Falcons Stadium 1.9 Billion.
  • Site Manager Rangers Stadium 1.2 Billion.
  • Site Manager for maintenance jobs on AT&T stadium, Fl marlins, lucas oil stadium, Salt lake city retractable enclosures.
  • Ironworker GFS
  • Organized and participated in monthly on-site meetings with clientele and subcontractors.
  • Maintained safe operating compliance and verified that operations met best practice standards.
  • Directed site activities to drive smooth operations and achieve quality assurance metrics.

Ironworker Supervisor

DH Griffin
Duncan, SC
02.2012 - 06.2015
  • Welder mig, stick.
  • Rigger and crane signal man.
  • Set heavy equipment
  • Operate forklift, lulls.
  • Connected Iron at Disney Avatar.
  • Superintendent for Avatar at Disney.
  • Site Superintendent Pirates of Caribbean Roller change out.
  • Signaled crane operators in safe and accurate lifting and placing of reinforcing iron members and moved rebars manually into specific positions.
  • Worked closely with structural ironworkers, ornamental Ironworkers, riggers and machinery movers, enabling clear and safe cross-functional operations.
  • Received structural steel and moved it to modular locations.
  • Studied and understood blueprints and specifications before beginning work on projects.
  • Determined safety risks associated with projects and implemented precautions to address risks.
  • Collaborated with construction foreman to establish and confirm task sequences and reinforcing requirements.
  • Encouraged workers to take precautions to prevent mishaps and injuries on job sites.
  • Assessed blueprints and specifications to determine aspects of project before work started.
  • Managed and tracked materials and supplies needed for projects and expedited additional materials to avoid project delay.
  • Studied blueprints, drawings and specifications to determine layout of work.
  • Fabricated steel frames, columns, beams and girders according to blueprints or instructions from supervisors.
  • Positioned steel units, aligned holes and inserted temporary bolts while checking alignments and joining steel parts.
  • Aligned and connected structural components to create safe, long-lasting results.
  • Set up hoisting equipment to lift and place structural steel items.
  • Wrote and submitted detailed project reports and evaluated completed work via visual inspection to confirm safety and quality of work.
  • Multiple projects at Disney.
  • Installed worlds largest washer and drier units at ESPN.

Forman

Clarkson Industrial Contos
Spartanburg, SC
01.2011 - 05.2015
  • Brought supplies, equipment and tools to work locations.
  • Heated, formed and dressed metal parts with hand tools, torch and arc welding equipment.
  • Moved items between machines, conveyors and transport equipment to meet production needs.
  • Prevented distortion of parts by monitoring fitting, burning and welding processes.
  • Completed precision cuts with power saws, hand shears and chipping knives.
  • Operated machinery, managed raw material and logged production data.
  • Ran heavy equipment safely and efficiently to prevent injuries and accomplish tasks on time.
  • Followed safety guidelines through proper machine guarding and lockout and tagout procedures.
  • Scraped off excess spatter using portable grinders and arc-cutting equipment.
  • Completed minor torch ups with MIG welders.
  • Adjusted gas flow and pressure to create and maintain desired flames.
  • Used welding skills to help repair and maintain heavy-duty machinery.
  • Viewed and checked job equipment to determine maintenance requirements.

Education

Chesnee High School
Chesnee, SC

Skills

  • Team Supervision
  • Safety awareness
  • Building site supervision
  • OSHA safety requirements
  • Construction equipment
  • Interpreting blueprints
  • Job site management
  • Fall protection
  • Construction management
  • Job planning
  • Safety oversight
  • Emergency assistance

Certification

  • OSHA (Occupational Health and Safety Administration) certified
  • OSHA 10
  • OSHA 30
  • OSHA 510
  • NCCCO Certified Rigger Signal person RIG-1, TTR-1, SGP
  • Mastering construction-project-management certification
  • Construction-management-construction-field-management certification
  • Construction Management Fundamentals
  • OSHA Safety Training: Conducting Safety Meetings
  • Factory Automation using PLC Logics
  • Production planning and control - PPC
  • First Aid & CPR - An in Depth Guide to CPR, AED and Chocking
  • EM-385
  • Lean Six Sigma Green Belt Training 2022
  • Fall protection Certification
  • PMP- Project Management Professional Certification Program
  • AutoStore certified
  • Geek Robotic Certification
  • LOTO certification
  • OSHA 500

References

References available upon request.

Timeline

Senior Site Manager

KPI Solutions
07.2022 - Current

Site Superintendent

DH Griffin
10.2019 - 07.2022

Site Manager

Uni systems engineering
06.2015 - 10.2019

Ironworker Supervisor

DH Griffin
02.2012 - 06.2015

Forman

Clarkson Industrial Contos
01.2011 - 05.2015

Chesnee High School
Matthew Scruggs