Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Mauro Gonzalez

Pharr,TX

Summary

Hardworking Scaffold Foreman with 12 years of experience building, inspecting, and monitoring numerous job sites. Motivational leader dedicated to keeping teams focused and working efficiently to complete comprehensive projects under rigid deadlines. Highly-effective communicator with clear expectations and balanced team coordination. Fast-working Scaffolder skilled in working all types of weather conditions and unafraid of heights. Committed and collaborative team player with attention to safety and fantastic organization. Works efficiently in confined spaces to build safe and effective scaffolding systems. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy.

Overview

12
12
years of professional experience

Work History

Scaffold Leadman

Westinghouse
02.2024 - Current
  • Ensuring that onsite health and safety regulations are followed. Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
  • Verified all scaffolding materials were stored safely and securely. Utilized ladders, small lifts, and rope access systems to safely access hard-to-reach areas.
  • Built custom scaffolding structures to specifications for diverse applications.
  • Assembled, erected, and dismantled scaffolding structures to meet project needs.
  • Making sure that work methods are sufficient to meet project needs.

Scaffold Leadman

Bechtel Oil Gas & Chemicals
11.2023 - 02.2024
  • Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
  • Verified all scaffolding materials were stored safely and securely. Followed OSHA regulations and safety standards when installing and working with scaffolding.
  • Assisted with tying off and securing scaffolding to building structures to optimize safety.
  • Worked in team-focused environment to collaboratively complete projects on time and within budget.
  • Assembled, erected and dismantled scaffolding structures to meet project needs.

Scaffold Leadman

Day & Zimmermann
09.2023 - 10.2023
  • Ensuring that onsite health and safety regulations are followed. Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures.
  • Verified all scaffolding materials were stored safely and securely. Utilized ladders, small lifts, and rope access systems to safely access hard-to-reach areas.
  • Built custom scaffolding structures to specifications for diverse applications.
  • Assembled, erected, and dismantled scaffolding structures to meet project needs.
  • Making sure that work methods are sufficient to meet project needs.

Scaffold Foreman

Brock Group
07.2023 - 09.2023
  • Tracked supplies, employee hours and costs
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Coordinated job schedules and bids to maximize work and revenue
  • Inspected scaffold erections for condition and compliance with standards
  • Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures
  • Trained new employees on proper safety procedures for working on scaffolding
  • Verified all scaffolding materials were stored safely and securely
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Assisted with tying off and securing scaffolding to building structures to optimize safety
  • Worked in team-focused environment to collaboratively complete projects on time and within budget
  • Assembled, erected and dismantled scaffolding structures to meet project needs.

Scaffold Leadman

Brand Safeway LLC
01.2023 - 07.2023
  • Tracked supplies, employee hours and costs
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Coordinated job schedules and bids to maximize work and revenue
  • Inspected scaffold erections for condition and compliance with standards
  • Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures
  • Trained new employees on proper safety procedures for working on scaffolding
  • Verified all scaffolding materials were stored safely and securely
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Assisted with tying off and securing scaffolding to building structures to optimize safety
  • Worked in team-focused environment to collaboratively complete projects on time and within budget
  • Assembled, erected and dismantled scaffolding structures to meet project needs.

Scaffold Leadman

Excel Modular Scaffolding
09.2022 - 11.2022
  • Tracked supplies, employee hours and costs
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Coordinated job schedules and bids to maximize work and revenue
  • Inspected scaffold erections for condition and compliance with standards
  • Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures
  • Trained new employees on proper safety procedures for working on scaffolding
  • Verified all scaffolding materials were stored safely and securely
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Assisted with tying off and securing scaffolding to building structures to optimize safety
  • Worked in team-focused environment to collaboratively complete projects on time and within budget
  • Assembled, erected and dismantled scaffolding structures to meet project needs.

Scaffold Foreman

Brock Group
12.2019 - 08.2022
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts
  • Inspected scaffolding for safety and structural integrity before each use
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Tracked supplies, employee hours and costs
  • Inspected scaffold erections for condition and compliance with standards
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Trained new employees on proper safety procedures for working on scaffolding
  • Inspected scaffolding for safety and structural integrity before each use.

Scaffold Leadman

Industrial Scaffolding
06.2019 - 09.2019
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts
  • Inspected scaffolding for safety and structural integrity before each use
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Tracked supplies, employee hours and costs
  • Inspected scaffold erections for condition and compliance with standards
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Trained new employees on proper safety procedures for working on scaffolding
  • Inspected scaffolding for safety and structural integrity before each use.

Scaffold Leadman

Brock Services LLC
08.2018 - 03.2019
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts
  • Inspected scaffolding for safety and structural integrity before each use
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Tracked supplies, employee hours and costs
  • Inspected scaffold erections for condition and compliance with standards
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Trained new employees on proper safety procedures for working on scaffolding
  • Inspected scaffolding for safety and structural integrity before each use.

Scaffold Leadman

Brand Scaffold
08.2017 - 08.2018
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts
  • Inspected scaffolding for safety and structural integrity before each use
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Tracked supplies, employee hours and costs
  • Inspected scaffold erections for condition and compliance with standards
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Trained new employees on proper safety procedures for working on scaffolding
  • Inspected scaffolding for safety and structural integrity before each use.

Scaffold Leadman

A & L Industrial Services
02.2016 - 09.2016
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts
  • Inspected scaffolding for safety and structural integrity before each use
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Tracked supplies, employee hours and costs
  • Inspected scaffold erections for condition and compliance with standards
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Trained new employees on proper safety procedures for working on scaffolding
  • Inspected scaffolding for safety and structural integrity before each use.

Scaffold Leadman

Brock Services LLC
05.2015 - 02.2016
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts
  • Inspected scaffolding for safety and structural integrity before each use
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Tracked supplies, employee hours and costs
  • Inspected scaffold erections for condition and compliance with standards
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Trained new employees on proper safety procedures for working on scaffolding
  • Inspected scaffolding for safety and structural integrity before each use.

Scaffold Leadman

Brand Scaffold
02.2014 - 05.2015
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts
  • Inspected scaffolding for safety and structural integrity before each use
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Tracked supplies, employee hours and costs
  • Inspected scaffold erections for condition and compliance with standards
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Trained new employees on proper safety procedures for working on scaffolding
  • Inspected scaffolding for safety and structural integrity before each use.

Scaffold Leadman

PCI Scaffolds
03.2013 - 01.2014
  • Safely installed and dismantled scaffolding from aerial lifts and larger lifts
  • Inspected scaffolding for safety and structural integrity before each use
  • Utilized ladders, small lifts and rope access systems to safely access hard-to-reach areas
  • Planned each job with appropriate safety measures, addressing weight limits and fall protection
  • Tracked supplies, employee hours and costs
  • Inspected scaffold erections for condition and compliance with standards
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Trained new employees on proper safety procedures for working on scaffolding
  • Inspected scaffolding for safety and structural integrity before each use.

Scaffold Carpenter

Total Industrial Plant
11.2011 - 01.2013
  • Supervising and undertaking scaffold work within a scaffold environment
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Assisted with tying off and securing scaffolding to building structures to optimize safety
  • Assembled, erected and dismantled scaffolding structures to meet project needs
  • Disassembled scaffolding and equipment when projects were completed or after each shift according to strict schedules
  • Built custom scaffolding structures to specifications for diverse applications
  • Verified all scaffolding materials were stored safely and securely
  • Utilized problem-solving skills to troubleshoot and resolve issues with scaffolding structures
  • Verified all scaffolding materials were stored safely and securely
  • Followed OSHA regulations and safety standards when installing and working with scaffolding
  • Assisted with tying off and securing scaffolding to building structures to optimize safety.

Education

High School Diploma -

Psja North Early College High School
05.2008

Skills

  • Scaffolding Assembly
  • Safe Work Practices
  • Critical Thinking
  • Maintaining Clean Work Areas
  • Engineering Specifications
  • Project Support
  • Corporate Regulations
  • Team Relationships
  • Active Communication
  • Safety Practice Observance
  • Structural Modification
  • Work Crew Coordination
  • Structural Knowledge
  • Regulatory Compliance
  • Coaching and Training
  • Operational Procedures
  • Scaffold Erection
  • Confined Spaces Expertise
  • Health and Safety Practices
  • Civil Engineering
  • Reading Schematics
  • Managing Materials
  • Repair Structures
  • Hand and Power Tool Operation
  • Maintain Site Safety
  • Demolition and Cleanup
  • Calculations and Measurements

Languages

Spanish
Native or Bilingual
English
Native or Bilingual

Timeline

Scaffold Leadman

Westinghouse
02.2024 - Current

Scaffold Leadman

Bechtel Oil Gas & Chemicals
11.2023 - 02.2024

Scaffold Leadman

Day & Zimmermann
09.2023 - 10.2023

Scaffold Foreman

Brock Group
07.2023 - 09.2023

Scaffold Leadman

Brand Safeway LLC
01.2023 - 07.2023

Scaffold Leadman

Excel Modular Scaffolding
09.2022 - 11.2022

Scaffold Foreman

Brock Group
12.2019 - 08.2022

Scaffold Leadman

Industrial Scaffolding
06.2019 - 09.2019

Scaffold Leadman

Brock Services LLC
08.2018 - 03.2019

Scaffold Leadman

Brand Scaffold
08.2017 - 08.2018

Scaffold Leadman

A & L Industrial Services
02.2016 - 09.2016

Scaffold Leadman

Brock Services LLC
05.2015 - 02.2016

Scaffold Leadman

Brand Scaffold
02.2014 - 05.2015

Scaffold Leadman

PCI Scaffolds
03.2013 - 01.2014

Scaffold Carpenter

Total Industrial Plant
11.2011 - 01.2013

High School Diploma -

Psja North Early College High School
Mauro Gonzalez