Lead radiation safety and protection initiatives at Hope Creek Generating Station, ensuring strict compliance with regulatory standards and industry best practices. Oversee personnel, strategic planning, and execution of radiation protection measures to maintain a safe work environment.
Online Supervision
- Serves as the Radiation Protection Department’s Performance Indicator Data Steward, responsible for compiling and reporting monthly radiation exposure data to INPO.
- Coordination with multiple work groups to execute routine and emergent maintenance activities efficiently.
- Provide leadership and guidance to a team of 25 personnel, ensuring adherence to radiation safety protocols.
- Supervised the execution of key maintenance and repair operations, including:
-Five waterbox leak repairs
-TCV repairs
-Steam piping leak repairs
-Offgas leak search and repairs
- Managed special projects such as the irradiated hardware campaign and C condensate polisher liner replacement, ensuring timely completion and regulatory compliance.
Outage Supervision
H1R25 – Turbine Building Supervision
- Supervised the entire turbine building during the outage, ensuring strict contamination control and radiation protection.
- Oversaw high-risk maintenance activities, including:
-Removal and sandblasting of HP and LP turbine blades
-High contamination work on MSSVs and TCVs
-Operations within all three condenser hotwells and waterboxes
S2R27 – ALARA and Auxiliary Building Supervision
- Served as ALARA supervisor, managing radiation exposure optimization efforts.
- Led supervision in the auxiliary building, overseeing critical maintenance tasks such as:
-15 year LDHX end bell removal and repair
-RHR pump replacement
-2CV-52 valve replacement
-Three resin sluices and two resin filter replacements
-Multiple responses to PCEs and PEIs
S1R30 – Auxiliary Building Supervision
- Directed radiation safety operations in the auxiliary building, ensuring safe execution of high-exposure tasks.
- Supervised major maintenance activities, including:
-Multiple valve breaches and replacements, including 1SJ-70 valve breach
-Charging pump bearing replacements
-Crud burst support operations
-Resin sluicing and filter replacements
-Multiple responses to PCEs and PEIs