Dynamic Civil Foreman with proven success at Whaley Construction, specializing in risk assessments and safety compliance. Expert in utility installation and site supervision, I enhanced project quality through meticulous inspections and effective crew training. Recognized for optimizing operations and fostering strong subcontractor relationships, ensuring timely project completion and adherence to environmental regulations.
Civil construction professional with track record of leading site operations and managing resources to meet project deadlines. Known for fostering team collaboration and adapting to changing project requirements. Skilled in project planning and conflict resolution, ensuring high-quality outcomes.
Work History
Geotechnical Engineer
6 Months
Bluerock Engineering | 03.2026 - Current
Oversaw site assessments, ensuring compliance with safety regulations and environmental standards.
Managed field testing programs, including Standard Penetration Tests and Cone Penetration Tests, ensuring data integrity.
Presented technical findings to clients and stakeholders, facilitating informed decision-making throughout project lifecycle.
Conducted field inspections and monitoring programs, ensuring compliance with industry standards and best practices in geotechnical engineering.
Performed advanced laboratory testing on soils, rocks, and construction materials to ensure safe and efficient building practices.
Ironworker
6 Months
C&C Construction Services | 09.2025 - 03.2026
Fabricated steel components according to blueprints and project specifications.
Installed structural frameworks, including beams, columns, and reinforcing bars.
Erected structural steel and iron frameworks for bridges, buildings and other structures.
Cut metal components to required lengths using metal shears, hacksaws, and bar cutters.
Upheld high-quality craftsmanship standards while working on complex projects, resulting in successful completion with minimal defects or rework required.
Expedited construction timelines by effectively operating heavy equipment, such as cranes and forklifts.
Civil Foreman
8 Months
Whaley Construction | 01.2025 - 09.2025
Developed comprehensive risk assessments for potential hazards on job sites, leading to a reduction in accidents and injuries among crew members.
Demonstrated expertise in various construction methods, including concrete forming, steel erection, earthworks, piping installation, and utility connections.
Achieved timely completion of projects through diligent oversight of daily operations and resource allocation.
Ensured safety compliance by conducting regular site inspections and enforcing adherence to regulations.
Trained new crew members, resulting in increased productivity and reduced error rates on the job site.
Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
Inspected completed work to verify quality standards and compliance with criteria.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Inspected equipment and tools used for safe operation.
Civil Foreman
1 Year 11 Months
Josh Nichole’s Construction | 02.2023 - 01.2025
Led teams in achieving successful completion of complex construction projects, showcasing strong problem-solving skills and adaptability under changing circumstances.
Collaborated with project managers to develop accurate schedules, budgets, and progress reports for stakeholders.
Implemented quality control measures for each stage of construction, leading to fewer defects and rework requirements.
Optimized equipment usage by scheduling routine maintenance, resulting in reduced downtime and increased productivity.
Established strong relationships with subcontractors to ensure timely delivery of materials and services at competitive prices.
Directed projects according to schedule and quality demands.
Equipment Operator
2 Years 5 Months
Signature Development | 09.2020 - 02.2023
Drove vehicles to and from work sites and maintained clean driving record.
Trained in diverse pieces of equipment and useful attachments to handle team needs.
Completed minor repairs and replacements of equipment parts to restore functionality.
Ensured safe working environment through adherence to safety guidelines and protocols for equipment operation.
Operated machining equipment safely with team of operators.
Contributed to project completion, skillfully operating various heavy machinery such as excavators, bulldozers, and loaders.
Loaded and unloaded materials from trucks, cranes and other and coordinated supplies to promote efficiency.
Graded earth and smoothed surfaces as part of projects or finish work.
Enhanced safety protocols by rigorously following operating procedures for heavy machinery.
Conducted daily maintenance checks on equipment, preventing downtime and maintaining productivity.
Contributed to environmental sustainability efforts by adopting green operating practices and reducing waste.
Operated heavy equipment to move large quantities of dirt and debris.
Loaded and unloaded construction materials on site.
Loaded and moved materials such as dirt and rocks based on specific job needs.
Removed topsoil, vegetation, and rocks to grade earth to specifications.
Adjusted soil levels and grade land for construction projects.
Read blueprints and understood technical drawings.
Pipe Layer
2 Years 4 Months
Chris Haggard Plumbing | 05.2018 - 09.2020
Handled all repairs for sanitary and storm water sewer structures and pipe systems.
Improved project efficiency by accurately measuring, cutting, and joining pipes for various construction projects.
Increased overall project quality by performing thorough inspections of installed pipes to detect leaks or defects.
Ensured optimal pipe alignment and connection, preventing future leaks and infrastructure issues.
Installed various types of pipes, including PVC, concrete, and metal, ensuring efficient water and waste flow for municipal projects.
Utilized heavy machinery, such as excavators and backhoes, for trench digging while minimizing impact on surrounding areas.
Followed plans to locate existing utilities prior to digging and flagged locations for operators.
Graded or leveled trench bases using tamping machines or hand tools.
Installed new hydrants, valves and lines to meet fire department needs and protect residents.