Lifting of 20 ft. and 40 ft. containers, generators;
Back loading and transfer of containers, open top containers, all scrap materials from barge to supply vessel and transfer of new materials from supply vessel to barge by means of crane;
Rebuilding of new accommodations: Removal of old windows, old panel board and installations of new windows and panel boards by using chain blocks and lever hoist;
Removal of old platform generators and installation of new platform generators;
Installation of new valves, and new water line pipes using chain blocks and lever hoist;
Removal of old tanks, old pig launcher, old gang way, installation of new tanks, pig launcher and gang way by use of chain blocks and lever hoist.
MAIN PROJECT: Kumul Platform Rejuvenation
CONTACT PERSON: John Cooke - Project Manager - Oil and Gas Division Brenton Cochrane - Senior H3SE Advisor - Oil and Gas Engineering Construction
RIGGER
MARITIME INDUSTRIAL SERVICES INC. LTD. CO.
07.2004 - 09.2011
Company Overview: http://www.miscoltd.com
Lifting of 20 ft and 40 ft container.
Lifting of different thickness of plates.
Lifting of I Beam and T Beam.
Lifting of different sizes of pipes.
Dubai Petroleum Company - Offshore experience labor supply pigging job, built Phase I and Phase II platform with Separator Project and heat exchanger, H2S Project
Dubai Natural Gas - onshore experience labor supply MTBE shutdown, shutdown removal of bundle puller, removal of valves and spool
Onshore M.I.S. Field Project
Rig ENSCO-54 - Modification of accommodation and count deliver
Rig FG McClintock - Making new P tank and new accommodation
Rig Key Hawaii - Making new legs of the rig
Rig AD-08 - Modification of accommodation and count deliver
Rig Ittihad - Modification of the rig
KS Endeavor Rig - Making new build rig.
Install jacking gear box from leg well.
Knowing to read a load cell in Manitowoc and telescopic crane.
Fitting shelcan thru the skirt.
MAIN PROJECT: Fabrication, building of vessel, pipes, assembling of jacket, module and rig and accommodation ship. Repairing old rigs-drilling and accommodation rigs.
CONTACT PERSON: Brian John Oliver - Rigging Superintendent - M.I.S. Sharjah, UAE - (+97) 14 883 7040
Quality Control
FIRST INTERNATIONAL COMPUTER
08.1996 - 08.1998
Company Overview: http://www.fic.com.tw/
Manufacturing and assembling of personal computer
Final testing of mother board
Quality control
CONTACT PERSON: First International Computer, Inc - (02) 2209 5373
Material Handler
ASTEC POWER INC.
06.1995 - 07.1996
Material handler
Component preparation
Education
Basic Seaman Course -
Cavite College of Fisheries
04.1994
Bachelor of Science - Radiologic Technology
De La Salle University - Dasmariñas Cavite
01.1993
4 Year Secondary Graduate - undefined
Immaculate Conception School
01.1991
Skills
Site setup
Load movement control
Climbing skills
Quality control checking
Quality control development
Proficiency in recognized hand signals
Strong situational awareness
Effective communication and teamwork
Commitment to safety and hazard prevention
Certification
Certificate of Appreciation - Onshore Margham Dubai Establishment
* Certificate for Falah "C" HP Separator Project - Offshore Dubai Petroleum Company
Certificate of Appreciation - Offshore H2S Fixed Gas Detector's
Project
Certificate of Recognition - MIS Yard H2S Fixed Gas Detector Project for DPC Certificate of Appreciation - 2018 BSP West AMPA 6 AMECFW
Turnaround Team Certificate of Appreciation - 2019 BSP West AMPA 6/AMRJ01 Turnaround Team
Timeline
Instructor
Compass Training Center
12.2023 - Current
RIGGER
WOOD AMEC FOSTER WHEELER
03.2020 - 07.2021
RIGGER
AMEC FOSTER WHEELER
03.2019 - 10.2019
RIGGER
CLOUGH AMEC CAPE PHILIPPINES
08.2014 - 09.2014
RIGGER
CLOUGH AMEC CAPE PHILIPPINES
12.2011 - 06.2012
RIGGER
MARITIME INDUSTRIAL SERVICES INC. LTD. CO.
07.2004 - 09.2011
Quality Control
FIRST INTERNATIONAL COMPUTER
08.1996 - 08.1998
Material Handler
ASTEC POWER INC.
06.1995 - 07.1996
Bachelor of Science - Radiologic Technology
De La Salle University - Dasmariñas Cavite
4 Year Secondary Graduate - undefined
Immaculate Conception School
Basic Seaman Course -
Cavite College of Fisheries
Award Received
Certificate of Appreciation – Onshore Margham Dubai Establishment, Certificate for Falah “C” HP Separator Project – Offshore Dubai Petroleum Company, Certificate of Appreciation – Offshore H2S Fixed Gas Detector’s Project, Certificate of Recognition – MIS Yard H2S Fixed Gas Detector Project for DPC, Certificate of Appreciation – 2018 BSP West AMPA 6 AMECFW Turnaround Team, Certificate of Appreciation – 2019 BSP West AMPA 6/AMRJ01 Turnaround Team
Seminars/Trainings Attended
August 1, 2018 Introduction to Rigging and Lifting Operation
July 20 – 22, 2018 Tropical Basic Offshore Safety Induction and Emergency Training with Emergency Breathing System and Travel Safety by Boat
July 26 – 27, 2018 International Minimum Industry Safety Training
June 7, 2018 Asbestos Awareness
October 26, 2008 Middle East Safety & Security Institute Co. Rigging & Slinging
August 9, 2005 Dubai Petroleum Company - HSE Offshore Orientation
June 3, 2005 Gulf Technical & Safety Training Centre (LLC) Waste management Awareness
March 15, 2005 MIS HSE Department Fall Protection Training / Fire Fighting Training / Confined Space Entry Standard / DPC safety Orientation
March 16, 2005 MIS HSE Department Basic First-Aid Awareness / Basic Instruction in the use of PPE / Swing Rope Training / H2S/SCBA Awareness
March 23, 2005 Dubai Petroleum Company Safety Marine Services Basic Rigging and Slinging
Parts Recycling at Standard Insurance Inc., Co. Technical and Training CenterParts Recycling at Standard Insurance Inc., Co. Technical and Training Center
SR. Multimedia Designer, Product Designer at Infinity Sports International Inc.SR. Multimedia Designer, Product Designer at Infinity Sports International Inc.