Dynamic ironworker and stick &MIG welder with extensive experience at Brahma Group Inc. Proven track record in structural welding and equipment repair, ensuring safety and quality control. Adept at collaborating with teams to enhance project efficiency and meet deadlines, while maintaining OSHA and MSHA compliance and implementing effective safety protocols.
Overview
8
8
years of professional experience
Work History
Ironworker/mechanic
Brahma Group Inc
01.2022 - Current
Worked effectively in fast-paced environments.
Skilled at working independently and collaboratively in a team environment.
Proven ability to learn quickly and adapt to new situations.
Operated various tools and equipment proficiently while maintaining a safe work environment at all times.
Performed welding tasks as needed for equipment repair or fabrication projects, adhering to strict safety guidelines.
Assisted in the installation and commissioning of new equipment, ensuring smooth integration into existing systems.
Participated in ongoing training opportunities to expand skill set and maintain expertise in the field of industrial maintenance.
Replaced water pumps that feed the whole plant (calportland marana Az)
Demo out the tripper cart and install a new one inside the crusher.
Fully demoed and reconstructed new walkways inside the mill.
Pipefitter helper demo out old pipe install new pipe threaded and welded pipe
Measured, cut, threaded and assembled new pipe to place assembled pipe in hangers or other supports.
Improved pipefitting efficiency by assisting in the assembly, installation, and maintenance of piping systems.
Followed safe work practices, which included fall protection and personal protective equipment.
Set sleeves or inserts to provide support for pipes.
Tested piping systems for leaks by increasing pressure in pipes and observing gauges attached to pipes for indication of leaks.
Mounted brackets and hangers on walls and ceilings to hold pipes in place.
Maintained high standards in workmanship, resulting in consistently positive feedback from supervisors and clients.
Demonstrated versatility in skill set by adapting to different types of pipe materials such as steel, plastic, copper, amongst others while assisting on various projects.
Effectively managed time and resources by prioritizing tasks, ensuring smooth progress of projects from inception to completion.
Ironworker
Premier Building Group
01.2021 - 04.2022
•erecting, steel buildings
• forklift operator
•welding ,supports ,stairways and other miscellaneous items that needed welding
• all detail work putting up all siting around steel build and installing roof panels
Insulation around the whole building inside.
Ironworker
Stinger Bridge & Iron
08.2018 - 01.2021
Developed comprehensive schedules for ironwork projects, ensuring timely completion and client satisfaction.
Implemented quality control measures for all aspects of ironwork installation, ensuring client satisfaction upon project completion.
Contributed to aesthetic appeal of structures with precise installation of decorative ironwork.
Performed detailed inspections of ironwork to identify and rectify any defects, ensuring quality control.
Supported skilled ironworkers on complex projects, gaining hands on experience
Fabrication
Operated Forklift
Certified Mig welder
Erect steel girders beams
Working out on field jobs setting pre assembled bridges
Installation of border wall panels (eagle pass Texas , El Paso Texas , Yuma Arizona )
Cut with torches and plasma cutters
Ironwork
Optimized Process Designs LLC, OPD
08.2017 - 08.2018
Demonstrated versatility by working on various projects, including structural steel fabrication and ornamental ironwork.
Collaborated closely with architects, engineers, subcontractors, and foremen to ensure seamless integration of ironwork components into overall project designs.
Improved overall productivity by implementing new techniques or tools related to ironwork activities that allowed workers to complete tasks more efficiently.
Collaborated with multiple departments to ensure seamless integration of ironwork into overall project plans.
Enhanced project efficiency by coordinating and streamlining ironwork tasks among team members.
Increased project efficiency by accurately interpreting blueprints and specifications for structural ironwork projects.
Eliminated potential hazards through diligent adherence to safety protocols during all aspects of the work.
Coordinated with other trade professionals such as electricians and ironworkers to ensure smooth project completion while minimizing delays due to overlapping tasks or scheduling conflicts.
Set skids columns pipe racks installed pipe on pipe racks once finished with with all steel