Dynamic Foundry Technician at ESCO with a proven track record in quality control and safety protocols. Enhanced production efficiency by implementing innovative techniques, reducing defect rates significantly. Skilled in materials management and team collaboration, fostering a culture of safety and continuous improvement while minimizing waste and downtime. Forklift certified and adept at problem-solving.
Overview
3
3
years of professional experience
Work History
Foundry Technician
ESCO
2770 NW Yeon Ave, Portland, OR 97210
10.2021 - 11.2024
Ensured worker safety by implementing strict safety protocols and conducting regular training sessions.
Served as a liaison between management and shop floor workers, fostering open communication channels that improved overall workplace morale.
Troubleshot technical issues promptly, minimizing disruptions to production schedules.
Conducted thorough root-cause analyses to identify areas for improvement in production processes, resulting in reduced defect rates.
Performed routine maintenance on foundry equipment, extending service life and reducing unplanned downtime.
Implemented quality control measures that led to a significant reduction in scrapped castings.
Reduced lead times for project completion by effectively managing resources and prioritizing tasks.
Managed inventory levels efficiently to minimize waste while ensuring timely material availability for ongoing projects.
Collaborated closely with engineering teams to develop, test, and implement new foundry techniques for optimized performance.
Measured, mixed, and poured raw materials to create new molds.