Over 1 million yards of concrete placement. In heavy highway and commercial buildings. 14 bridges 200 plus levels of highrise buildings. 2 casinos and 2 sport stadiums.
Overview
15
15
years of professional experience
Work History
Concrete Placement Forman
Union Hall 242
07.2006 - 04.2021
Set wood and other forming materials to prepare for concrete pours.
Leveled, smoothed, and finished surfaces of poured concrete for construction projects.
Maintained clean, safe worksite for team safety and to help keep projects on-track.
Demolished and repaired old concrete surfaces.
Trained workers in proper methods, equipment operation and safety procedures.
Mixed, spread, and patched concrete to specifications.
Assisted crew members with positioning trucks and moved discharge chute to guide concrete into forms.
Poured and laid concrete for [Number] projects.
Inspected equipment and tools used for safe operation.
Directed projects according to schedule and quality demands.
Adapted concrete pouring and mixing plans to daily weather and climate.
Oversaw daily operations at site, keeping team production moving at optimal pace.
Assisted in recruiting and hiring new construction and extraction workers.
Confirmed employee time cards and handled payroll of [Number]-person construction team.
Education
High School Diploma -
Winslow High School
Winslow, AZ
12.1990
Skills
Project Leadership
Competent person
Traffic control Supervisor
Clean Driving record
CPR CARD Current
Crew Leadership
Project Planning
OSHA 10 Card
Certified signalman
Certified Rigger
Certified Rigger Inspector
Forklift Card
Timeline
Concrete Placement Forman
Union Hall 242
07.2006 - 04.2021
High School Diploma -
Winslow High School
Similar Profiles
Seth BussSeth Buss
Boilermaker at Cole (Boilermaker Union 242)Boilermaker at Cole (Boilermaker Union 242)