
US Military from November 2005 to september 2012. I was honorably discharged after 2 enlistments and 2 deployments. In 2013 started a carrier in the Oil and Gas fracking for Halliburton Well Services. Fracking involves creating high pressure pumping systems capable of pumping 5000 gal a min at 13,000 psi. The systems bad to be broke down rebuilt and tested daily. We also built and used chemical pumping systems to inject chemicals into the low pressure side of our manifold. These systems must be rebuild and constantly running throught the day. Pressure control is crutial so we build pop offs blead off lines loop lines constantly checking the integrity of our equipment and iron. Normally worked 14-16 hr days while in oil field working 2 weeks on one off. Was doing 10 hr days while drilling for underground specialists. I have worked in all weather conditions from 114 in Texas to -30 in North Dakota. I do not show up late or miss work I like to work and learn new things daily. I am 100 percent committed to this Refrigeration/Servicer apprenticeship and doing this for the rest of my life.