Experienced Labor Pipe Layer Foreman skilled in trench safety, heavy equipment operation, and sewer line installation. Proven ability to supervise projects and coordinate crew activities to maximize efficiency and ensure compliance with safety regulations.
Work History
Labor Pipe Layer Foreman
2 Years 9 Months
W.G. Tomko | 11.2023 - Current
Installed and repaired underground piping systems efficiently.
Operated excavation machinery to prepare sites for pipe installation.
Collaborated with team members to ensure project timelines were met.
Conducted inspections of installed pipes for quality and compliance.
Read and understood drawings, written instructions and blueprints to plan work and layout pipe.
Supervised daily operations to ensure compliance with safety regulations and quality standards.
Coordinated crew activities to maximize productivity and efficiency on job sites.
Managed materials inventory, ensuring timely procurement and efficient use of resources.
Liaised with project managers to align field operations with project timelines and objectives.
Labor Pipe Layer Sub Foreman
2 Years 6 Months
Costa | 04.2021 - 10.2023
Operated excavation equipment to ensure precise pipe installation depth and alignment.
Assisted in laying various types of piping, including water and sewer lines, following safety protocols.
Collaborated with team members to identify and resolve pipeline installation challenges efficiently.
Conducted routine inspections of installed pipes to maintain quality standards and prevent leaks.
Oversaw daily operations on job sites, ensuring compliance with safety regulations and project timelines.
Maintained accurate documentation of work completed, including measurements, materials used, and any deviations from initial plans.
Expedited emergency repairs during critical breakdowns, restoring essential services with minimal downtime.
Collaborated with engineers and project managers to update on progress and address any unforeseen challenges promptly.
Labor Pipe Layer
20 Years 6 Months
W.G. Tomko | 02.2006 - 2021
Installed piping systems in residential and commercial settings according to specifications.
Operated heavy machinery for trenching and pipe placement, ensuring safety compliance.
Collaborated with team members to complete projects on time and within budget.
Conducted inspections of installed pipes for quality assurance and functionality.
Trained new employees on proper installation techniques and safety protocols.
Handled all repairs for sanitary and storm water sewer structures and pipe systems.
Education
High School Diploma
Langley | Pittsburgh, PA | 06-2000
Have taken courses in stormwater management and collection. Also hydrostatic testing and pressure testing of different types of lines.
I also have 15 plus years of experience in underground utilities and road work