Well versed in site management and scheduling with drive to create positive working environment for all employee's. Keen problem solver with background in implementing safety procedures.
Formed,poured and finished concrete with the appropriate rebar mat to government spec's.
R-11 Project
Concrete crack and joint repair as well as waterproofing at fuel offload containment area.
Complete removal and replacement of fuel loading containment area..
All at WPAFB.
Joint compound removal and replacement along with concrete repair.
Minot AFB
Steel stud framing
Bangor Naval Base
Dorm interior and exterior demolition. Steel stud framing replacement.
Lackland AFB
25 years of construction experience
Scheduling and supervision experience
OSHA 30
conventional and steel stud framing
concrete
flooring
drywall
equipment operoperation
blueprint reading