Boiler Maker
JVIC Industrial
- Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
- Maintained compliance with all safety procedures from both client and employer.
- Tightened or replaced bolts and gaskets to repair leaks.
- Inspected equipment and structures to determine scope of work (SOW).
- Used hand signals to notify crane operator to lift components to specific positions.