Highly skilled Project Manager with a strong background in commercial glass and glazing subcontracting. Demonstrated expertise in successfully overseeing and delivering projects within budget and on schedule. Possessing a comprehensive understanding of project management methodologies. I have effectively led teams and collaborated with stakeholders to achieve project objectives. I am adept at managing multiple projects simultaneously with ensuring quality workmanship and client satisfaction.
Overview
6
6
years of professional experience
Work History
Glass & Glazing Project Manager
Terrell Glass and Mirror, Inc.
01.2023 - Current
Manage a project from pre-construction to closeout and punch list, ensuring all contract obligations are met.
Meet all the criteria of the architect's design intent to ensure project success while remaining under budget.
Responsible for multiple commercial construction projects totaling over $10 million.
Developed comprehensive project plans with clear timelines, milestones, and budget requirements, ensuring timely delivery of high-quality results.
Coordinated cross-functional teams and resolved conflicts, maintaining a positive work environment throughout the project lifecycle.
Mentored junior team members in project management best practices to enhance their skills and contribute to better overall performance.
Implemented continuous improvement initiatives to optimize project outcomes while maintaining costeffectiveness.
Managed risk assessments and implemented mitigation strategies to minimize potential issues during project execution.
Utility Pole Inspector
Spartan Utility Services, LLC
01.2022 - Current
Improved inspection efficiency by implementing advanced data analysis tools and techniques.
Enhanced company safety standards by conducting thorough inspections of equipment and facilities.
Streamlined inspection processes for faster turnaround times, resulting in increased productivity.
Ensured compliance with industry regulations through meticulous attention to detail during inspections.
Enhanced damage assessment accuracy by conducting thorough site inspections and documenting findings.
Reduced claim processing times by efficiently evaluating property damages.
Ensured compliance with regulatory requirements by performing regular audits and staying up-to-date on industry standards.
General Plant Manager
LTS Industrial, LLC
01.2020 - 01.2022
Streamlined supply chain operations, reducing lead times and improving inventory management.
Forecasted future production needs accurately, allowing for strategic decision-making regarding staffing levels, equipment investments, and inventory management.
Built strong relationships with regulatory agencies and ensured compliance with all environmental permits; maintained an exemplary safety record.
Increased production efficiency by optimizing plant layout and implementing process improvements.
Managed budgeting and resource allocation, ensuring optimal use of funds for operational efficiency.
Boosted employee morale and productivity through effective leadership and motivational techniques.
Mentored and developed staff members, promoting professional growth opportunities within the organization.
Balanced labor needs with production schedules to optimize workforce utilization while maintaining output targets.
Substation Technician
Great Southwestern Construction Inc.
10.2017 - 12.2019
Ensured timely completion of projects by developing and maintaining schedules for work progress.
Increased productivity by operating heavy machinery such as backhoes, ditch-witch, sky track, and excavators for various construction projects.
Collaborated with team members to complete complex projects, utilizing strong communication skills and problem-solving abilities.
Collaborated with other foremen to streamline workflows for improved efficiency across teams.
Collaborated with engineering teams to install new substations or upgrade existing facilities for optimized performance.
Assisted in load management tasks, installing transformers, ground grid, pull boxes, and buss work to accommodate fluctuations in power demand.
Completed projects during normal plant operations while buss duct was live.
Installed and timed 3 phase switches per Oncor guidelines and switch training class.