Adept at leading construction projects, my tenure at Blinderman Construction Company showcased my ability to manage teams and ensure project completion with quality and efficiency. Skilled in blueprint interpretation and project management, I excel in fostering team collaboration and driving significant improvements in construction processes. My approach combines hands-on expertise with a commitment to mentoring apprentices, ensuring project success and team growth.
Overview
2
2
years of professional experience
Work History
Lead Carpenter
Blinderman Construction Company
Chicago, IL
08.2022 - 10.2024
Performing all daily tasks and coordinating all labor in the scope of the project.
Removed damaged or defective parts or sections of structures and repaired or replaced using hand tools.
Supervised a team of carpenters to ensure timely completion of projects.
Applied acoustic paneling to ceilings and walls to adjust sound absorption and rebound within rooms.
Developed strategies to minimize costs while maintaining quality standards.
Led apprentices and trainees in building construction and renovation.
Installed windows, flooring, or trim using hand or power tools.
Adhered to project blueprints and requirements to deliver quality work.
Studied blueprints or building plans to prepare layout and materials required.
Trained junior staff members on proper use of hand and power tools and safe working practices.
Installed cabinets, base cabinets and crown molding.
Performed various carpentry duties, including both rough and finish carpentry.
Repaired or replaced damaged or defective parts using power tools and equipment.
Planned work based on blueprints and individual project specifications.
Contracted and collaborated with specialty sub-contractors for special trade jobs or installations.
Bore boltholes in wood, masonry or concrete using electric or pneumatic drill.
Implemented new processes or methods for more efficient execution of carpentry operations.
Positioned and installed floor joists, trusses and rafters.
Cut and installed tile and hardwood flooring for residential and commercial buildings.
Troubleshot problems related to construction techniques or materials used in carpentry projects.
Reviewed jobsite needs with foreman and coordinated construction.
Installed building windows, trim and cabinetry alone or with assistants to meet job deadlines.
Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
Measured, cut, and installed staircase spindles.
Used various carpenter's hand tools, portable power tools and standard measuring instruments.
Roughed in door and window frames or subflooring in structures undergoing construction or repair.
Planned ahead for future needs by assessing available materials and ordering additional supplies as needed.
Conducted regular maintenance checks on power tools and other equipment used by the carpentry team.
Used band, circular and compound miter saws.
Studied blueprints, sketches or building plans to prepare project layout and determine dimensions and materials required.