Hard-working professional with 22 years of experience and a proven knowledge of inventory control, production lead time, and project management. Aiming to leverage my skills to successfully fill any position with advancement and upward mobility opportunity at your company.
Overview
24
24
years of professional experience
1
1
Certification
Work History
HEAD CARPENTER
Windriver Built Tiny Homes
09.2023 - 12.2024
-Ran framing table
PLUMBER
Complete Maintenance Company
09.2022 - 08.2023
-PVC pipe fitting, sottering copper pipe
-Clearing drains with jetter and large cable
-Replacing bad pipe under concrete and above
-Running excavator, and other heavy equipment
-Pouring concrete
PRESSURE WASHER
Water Boys
02.2022 - 08.2022
-Surface cleaning
-Soft washing houses
-Exterior window washing
FORK LIFT OPERATOR
Waupaca Foundry
05.2021 - 11.2021
-Load and unload car parts from semi’s with a fork lift.
-Use scanner to organize where merchandise goes.
-Keep track of inventory every day.
INSTALLER
D&R Aluminum
11.2020 - 03.2021
-Installed soffit and fascia on houses.
ERECTOR/LABORER
McCoy Industries
08.2020 - 11.2020
-Cut materials to specified sizes for installation, using gas powered concrete saws.
-Mix mortar and grout, manually and using machines, according to standard formulas.
-Rigging up per stressed structural flooring, flying it with crane using signals. Running concrete saw, lull, front end loader, bobcats.
TOW TRUCK DRIVER
Upmans Towing
02.2019 - 08.2020
-Driving Tow truck, towing vehicles on tow truck safely to destinations using GPS of customers choice.
-Wench outs, pulling vehicles out of ditches and off the side of the road when stuck.
-Changing flat tires, and jump-starting vehicles with dead batteries.
ERECTOR/LABORER
American Precast
06.2016 - 08.2018
-Rigging up per stressed structural flooring, flying it with crane using signals. Running concrete saw, lull, front end loader, bobcats.
-Mix mortar, plaster, and grout, manually or using machines, according to standard formulas.
-Cut materials to specified sizes for installation, using power saws or tile cutters.
CREW LEADER
Paver Mac
09.2015 - 06.2016
-Overseeing three to six crew members on the excavation, preparation, and laying of pavers.
-Installing and laying paver driveways and walkways with patterns or bricks.
-Constructing and putting up stone walls.
-Pressure washing sanding and sealing paver driveways and walkways.
-Running concreate saws, bobcat, and excavators. Mixing concreate.
OWNER/OPERATOR
Newfield's Property Management LLC
04.2013 - 06.2016
-Managed a landscape crew to customers standards.
-Organized routs, procedures, estimates, billing, and payments.
-Talked to customers in person to make sure they were satisfied with the work the was provided.
-Mow or edge lawns, using power mowers or edgers.
-Use hand tools, such as shovels, rakes, pruning saws, saws, hedge or brush trimmers, or axes.
-Prune or trim trees, shrubs, or hedges, using shears, pruners, or chain saws.
-Maintain or repair tools and equipment.
-Mix and spray or spread fertilizers, herbicides, or insecticides onto grass, shrubs, or trees, using hand sprayers
GLASS INSTALLER
Heritage Glass
02.2014 - 01.2015
-Measure mirrors and dimensions of areas to be covered to determine work procedures.
-Fabricate or install metal sashes or moldings for glass installation, using aluminum or steel framing.
-Determine plumb of walls or ceilings, using plumb lines and levels.
-Read and interpret blueprints or specifications to determine size, shape, color, type, or thickness of glass, location of framing, installation procedures, or staging or scaffolding materials required.
-Set glass doors into frames and bolt metal hinges, handles, locks, or other hardware to attach doors to frames and walls.
-Drive trucks to installation sites and unload mirrors, glass equipment, or tools.
INSTALLER
Architectural Foam Systems
05.2012 - 10.2012
-Installed stone looking foam molds on home exteriors.
LABORER
Questar Construction
05.2008 - 05.2012
-Ran lull delivering scaffolding, materials, equipment, and tools.
-Demolition tearing off siding, tearing out 2x4, 4x4, and existing walls.
-Framing, building wood framed walls, running circular saws, using tape measure, and power/hand tools.
-Tearing out and replacing bad concreate.
FORMAN
West Coast Precast
05.2001 - 05.2008
-Ran crew of six people cleaning, stripping, and preparing molds for next pour. Also built specialty molds.
-Ran front end loader putting sand and rock into mixer. Then forklift delivering mix to molds.