Summary
Overview
Work History
Education
Skills
Timeline
Generic

Michael Powell

Colorado Springs,CO

Summary

Dynamic carpenter with extensive experience at B & J General Contractors, recognized for delivering high-quality craftsmanship in cabinetry and structural installations. Proven ability to optimize workflows and enhance team collaboration, while ensuring safety and compliance. Bilingual and certified in boom-lift, scissor-lift, and forklift operations, excels in creative problem-solving and maintaining strong client relationships. Used to strenuous and heavy tasks and activities. Pays close attention in ensuring deadlines and budgets are met. Also has experience in working in high security areas and clean rooms.

Overview

14
14
years of professional experience

Work History

Carpenter

B & J General Contractors
Colorado Springs, CO
06.2022 - Current
  • Demonstrated versatility in carpentry techniques, working proficiently with both hand tools and power tools to achieve desired results.
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Read and interpreted blueprints to follow specifications of projects.
  • Optimized workspace organization by maintaining a clean, safe, and efficient work environment throughout each project''s duration.
  • Contributed to successful completion of residential and commercial projects by skillfully installing cabinetry, doors, windows, and flooring materials.
  • Repaired existing structures such as staircases, decks, or door frames with precision to extend their lifespan without compromising structural integrity or aesthetics.
  • Collaborated with other skilled tradespeople to ensure seamless integration of carpentry work within larger construction projects.
  • Delivered exceptional customer service by addressing client concerns promptly and professionally while keeping them informed of project progress.
  • Inspected job sites to identify potential hazards and establish protection and safety standards.
  • Strengthened team collaboration through effective communication and problem-solving skills during complex carpentry projects.

Carpenter

On the Level Remodeling
Colorado Springs, CO
11.2021 - 03.2022
  • Constructed custom cabinetry and furniture to meet client specifications.
  • Executed framing, drywall installation, and finishing tasks with precision and attention to detail.
  • Collaborated with subcontractors to ensure project timelines and quality standards were met.
  • Inspected completed work for compliance with building codes and safety regulations.
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Specialized in specific carpentry tasks such as framing, finish work, or restoration projects to provide clients with tailored services and high-quality results.

Contractor

Heather Dean
Mesa, AZ
11.2020 - 10.2021
  • Oversaw project timelines, ensuring on-time delivery of contractor services.
  • Implemented process improvements, enhancing workflow efficiency across projects.
  • Coordinated resource allocation, optimizing team performance and project outcomes.
  • Managed client communications, fostering strong relationships and addressing concerns promptly.
  • Delivered high-quality work on time and within budget, earning positive feedback from clients.
  • Delivered outstanding service to customers to maintain and extend relationships for future business opportunities.
  • Managed multiple projects simultaneously while maintaining strict adherence to deadlines and budgets.
  • Consulted with customers to assess needs and propose optimal solutions.
  • Kept site work safe and in line with budget, schedule, and applicable building codes.

General Lead Carpenter

Dobson Intel Complex/ Brycon
Chandler, AZ
01.2019 - 10.2020

Personalized from your experience. You can edit these in the next step.

  • Led construction projects, ensuring adherence to safety standards and quality specifications.
  • Supervised carpentry team, providing training and mentorship for skill development.
  • Coordinated material procurement to optimize project timelines and resource utilization.
  • Construction/Repair/Maintenance of an enormous chemical factory complex
  • Implemented process improvements, enhancing workflow efficiency and reducing downtime.

Framer

Level Line Builders Inc.
Phoenix, AZ
07.2017 - 12.2018
  • Understood steps needed to complete a home from the start to the finish.
  • Cleaned and organized job sites.
  • Cut, measured and shaped wood.
  • Examined wood for defects and damage.
  • Used machines and tools such as nail guns, saws and grinders safely and with accuracy.
  • Installed wall, roof and floor structures according to blueprints.
  • Completed tear-down of existing structures and prepared for new construction.
  • Prepared and cleaned construction sites by removing debris.
  • Removed damaged tile, brick and mortar.
  • Filled chipped, cracked and broken bricks and tiles with adhesives and grouting materials to correct surface imperfections.
  • Manually carried roofing materials up ladders.

Framer

Capuzzo Construction Inc
Cave Creek, AZ
01.2017 - 07.2017
  • Used machines and tools such as nail guns, saws and grinders safely and with accuracy.
  • Cut, measured and shaped wood.
  • Maintained excellent performance while working on group projects.
  • Cleaned and organized job sites.
  • Efficiently met deadlines under weather and time constraints.
  • Examined wood for defects and damage.
  • Understood steps needed to complete a home from the start to the finish.
  • Installed wall, roof and floor structures according to blueprints.
  • Used hoists and cranes to lift work pieces to machine.
  • Set ladders, scaffolds and hoists in place for taking supplies to roofs.
  • Applied caulk, sealants and other agents to installed surfaces.
  • Prepared and cleaned construction sites by removing debris.
  • Accurately read, understood, and carried out written instructions.
  • Followed company procedures to maintain work environment in a neat and orderly condition.
  • Loaded and unloaded building materials used for construction.
  • Used hand tools to change worn cutting tools.
  • Collaborated with other trades to smooth work flow and efficient organization operations.
  • Manually carried roofing materials up ladders.
  • Applied chemical solutions and used polishing machines to clean all installation surfaces, equipment, tools, work sites and storage areas.
  • Followed standards and procedures to maintain safe work environment.

Framer-LeadMan

Pro Cuts Construction
Surprise, AZ
02.2015 - 12.2016
  • Operated machines and tools, including nail guns, saws, and grinders, with precision and adherence to safety protocols.
  • Executed precise cutting, measuring, and shaping of wood materials.
  • Demonstrated consistent performance excellence in collaborative project environments.
  • Streamlined job site cleanliness and organization to enhance operational efficiency.
  • Consistently achieved project deadlines despite adverse weather and time constraints.
  • Inspected wood materials for defects and damage to ensure quality standards.
  • Comprehended comprehensive processes required for home completion from initiation to finalization.
  • Executed installation of wall, roof, and floor structures in alignment with blueprints.
  • Operated hoists and cranes to elevate work pieces for machining processes.

Fireproofing/Sandblasting/Coatings

Rolling Plains Construction
Apache Junction, AZ
01.2012 - 01.2015
  • Operated sandblasting equipment to remove contaminants from surfaces.
  • Applied fireproofing materials to structural elements, ensuring compliance with safety standards.
  • Conducted inspections on coated surfaces to assess quality and adhesion.
  • Assisted in training new team members on safe handling of tools and materials.
  • Collaborated with project managers to ensure timely completion of coating applications.
  • Maintained accurate records of materials used and work completed for reporting purposes.

Education

Associate of Science - Mathmatics/ Engineering

Phoenix Community College
Phoenix, AZ
2012

Skills

  • Building/Construction
  • Repair/Renovation/Remodeling
  • Mechanical Understanding/Use/Repair
  • Fireproofing/Coatings/Sandblasting
  • Bilingual Spanish/English(minimal basics)
  • Boom-lift/Scissor-lift/Forklift Certified
  • Rigging Certified
  • Basic Electrical/Plumbing
  • Creative Problem Solving/Quick Thinking/Initiative
  • Dependable/Hard Working/Follows Instructions
  • Safety oriented
  • Team Player/Team Building/Leadership
  • Flexible
  • TSA precheck approved/ Pass Criminal and Homeland Security check
  • Customer Service Oriented
  • Outstanding Communication
  • Passport ( expires 2036 )

Timeline

Carpenter

B & J General Contractors
06.2022 - Current

Carpenter

On the Level Remodeling
11.2021 - 03.2022

Contractor

Heather Dean
11.2020 - 10.2021

General Lead Carpenter

Dobson Intel Complex/ Brycon
01.2019 - 10.2020

Framer

Level Line Builders Inc.
07.2017 - 12.2018

Framer

Capuzzo Construction Inc
01.2017 - 07.2017

Framer-LeadMan

Pro Cuts Construction
02.2015 - 12.2016

Fireproofing/Sandblasting/Coatings

Rolling Plains Construction
01.2012 - 01.2015

Associate of Science - Mathmatics/ Engineering

Phoenix Community College