Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Michael Quinlan

Summary

General Foreman with demonstrated success in supervising crews, planning projects and maintaining records. Well-versed in Solar and adept at adapting to different requirements. Broad knowledge of different construction disciplines and project management. Flexible hard worker ready to learn and contribute to team success. Highly-motivated employee with desire to take on new challenges. Strong worth ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

3
3
years of professional experience
1
1
Certification

Work History

General Foreman

Ferrovial Webber Energy
Houston, TX
06.2023 - Current
  • Ensured safety protocols were followed and maintained by all personnel on site.
  • Supervised, trained, and evaluated assigned personnel in accordance with company policies and procedures.
  • Developed and implemented job plans for construction projects.
  • Monitored project progress to ensure efficient use of resources and timely completion of tasks.
  • Directed the activities of subcontractors to ensure quality workmanship and adherence to contract specifications.
  • Performed inspections of completed work prior to acceptance by client or owner representative.
  • Resolved conflicts between workers regarding job assignments, methods, or deadlines.
  • Analyzed blueprints and other documents to plan layout of projects.
  • Maintained accurate records of daily operations including time cards, production data logs.
  • Oversaw all aspects of construction including scheduling personnel and supplies as needed.
  • Responded promptly to inquiries from clients or owners representatives related to project status or progress.
  • Identified potential risks associated with each project before beginning work.
  • Prepared reports detailing progress against established benchmarks or milestones.
  • Communicated regularly with team members about changes in scope or schedule.
  • Interpreted engineering drawings and specifications during construction process.
  • Delegated work to team members and checked for completion in compliance with company guidelines and customer needs.
  • Followed rules and regulations to keep job sites safe for workers, contractors and visitors.
  • Documented labor hours, crew attendance and individual performance.
  • Reviewed blueprints and specifications prior to starting job to fully understand project scope.
  • Performed final walkthroughs of each job and prepared reports.
  • Recorded job supplies, parts, equipment and employee hours.
  • Directed fabrication of components needed for specific jobs.

General Foreman

Burns & McDonnell Constructors
Itasca, TX
03.2022 - 06.2023
  • Delegated work to team members and checked for completion in compliance with company guidelines and customer needs.
  • Followed rules and regulations to keep job sites safe for workers, contractors and visitors.
  • Documented labor hours, crew attendance and individual performance.
  • Performed final walkthroughs of each job and prepared reports.
  • Recorded job supplies, parts, equipment and employee hours.
  • Analyzed job sites to mitigate risks.
  • Communicated with employees to demonstrate high standards and mitigate issues.
  • Viewed and checked job equipment to determine maintenance requirements.
  • Handled all the 3rd party equipment that was rented from multiple vendors
  • Wrote and executed lifted plans for 50 inverters incoming ,staged and installed to final location
  • Directed employees in the building of inverter pads and the clean up of jobsite civil work to sell to client
  • Worked with employees in the commissioning process in changing out broken modules for replacement
  • Followed data from IR flyover to correct issues in field

Operator

Burns & McDonnell Constructors
Beeville, TX
02.2021 - 01.2022
  • Used skid steer and forklift to unload Solar Material from incoming trucks throughout jobsite to stage material for future use on site
  • Used forklift to assist in the process of installing torque tubes
  • Used skid steer to assist the module installers with the hanging of PV mods
  • Used various dirt equipment digging trenches,backfilling and compacting
  • Reported failures, malfunctions or wear issues on equipment to supervisor.
  • Followed daily preventive maintenance schedule for cleaning and lubricating machinery.

Education

General

Dayton High School
Dayton, TX
12.2007

Skills

  • Workplace Safety
  • Employee Training
  • Fall Protection
  • Job Planning
  • Site Inspection
  • Crew Scheduling
  • Daily Reporting
  • Problem-Solving
  • Time Management
  • Schematics and Blueprints
  • OSHA Compliance
  • Teamwork and Collaboration
  • Construction Vehicles Operation
  • Equipment Safety Verification
  • Site Measuring and Marking
  • Hand and Power Tool Operation
  • Assignment Delegation
  • Documentation and Recordkeeping
  • Dependable and Hardworking
  • Blueprint Reading
  • Worker Supervision
  • Equipment Operation
  • Team Leadership
  • Safe Operating Procedures
  • Verbal and Written Communication

Certification

  • NCCER Certified Foreman
  • NCCER Certified General Foreman

Timeline

General Foreman

Ferrovial Webber Energy
06.2023 - Current

General Foreman

Burns & McDonnell Constructors
03.2022 - 06.2023

Operator

Burns & McDonnell Constructors
02.2021 - 01.2022

General

Dayton High School
  • NCCER Certified Foreman
  • NCCER Certified General Foreman
Michael Quinlan