Rail Loader
I would get a bar to loosen steel wires to throw on top of trains to tighten down the drywall,then i would go to bagging to secure the drywall. After all the drywall was loaded you will get on top of the rail cars and latch the steel wire to the connect piece that is on top so after you tighten it down, the product won't fall off. I was only here for four months because i went through a contractor (crown staffing) but i was training new hires before my contract ended!

