Summary
Overview
Work History
Education
Skills
Professional Training
Career Experience
Additional Information
Timeline
Generic

Michael R. Gonzales

Goodyear,AZ

Summary

•Commercial builder for over 20yrs in AZ with some experience in California and Idaho. Five years United States Marine Corps

•Maricopa County Comprehensive 316 Dust Control

•OSHA30 from UC San Diego

•Arc Flash Training from S.W. Energy Systems

•Infared Imaging Introduction from The Snell Group

• Leadership mododual Training from USMC

Overview

2026
2026
years of professional experience

Work History

Construction Superintendent

N/A
1999 - Current
  • Oversaw daily operations and safety compliance on multiple construction sites.
  • Coordinated project schedules, ensuring timely completion of milestones and deliverables.
  • Managed subcontractor performance, enforcing quality standards and adherence to timelines.
  • Implemented process improvements, enhancing efficiency in resource allocation and workflow management.
  • Extensive background in commercial/industrial electrical

Education

Mathematics

Maricopa Community Colleges, Phoenix College
Phoenix, AZ

Skills

Commercial electrician/service manager for 14yrs

General Superintendent

Fire alarm Security alarm tech

Professional Training

  • Maricopa County Dust Control
  • OSHA 30 card from UC San Diego
  • Arc Flash Traing from South West Energy Systems
  • Infared Imaging introduction from The Snell Group
  • Leadership Module Training from United States Marine Corps

Career Experience

  • Under Alan Leichtman: The demo of an existing suite and rebuild of a Jersey Mikes Franchise. Coordinate the remodel of Safeway Grocery Store
  • Department Of Corrections Eyeman Cook Florence AZ: Coordinate and create schedules with HVAC sub. Demo of existing electrical and HVAC equipment. Impliment and supervise all electrical work from demo, rough-in to turn over.
  • ADOT Chinle MVD Remodel Chinle AZ: Coordinate with GC to remove and demo existing conditions. Identify existing electrical conditions and field design new system. Impliment and supervise all electrical from rough-in to turn over.
  • ADOT Tonopah Maintenence Yard: Provide new service entrance coordination with APS. Provide power from new service entrance to existing equipment, buildings, and new remodeled office building.
  • Washington Elementary School District
  • 2009: Under Brignall Construction and Alen Leichtman, Coordinate with SRP for new transformer and new power service to Royal Palm Elementary School. From ground up provide all electrical to three new buildings, three parking lots and one football field. Make/safe and demo three existing buildings and refurbish into new classroom space.

Additional Information

•Brickyards on Ellsworth 9253 E. Willis Rd Mesa AZ 85212

600K+ sq foot grey she'll warehouse with attached Nineteen Tenant Improvments office spaces at a value of $79 million. I was key coordination with SRP in the scheduling and disturbution of infrastructure and inspection and installation of power meters. Coordinated with team members to close out project with City of Mesa AZ.

•Power42 3937 S. Power Rd Mesa AZ 85212. Close out of three warehouse/TI buildings with City of Mesa.

Kept schedule and Coordinated Power Rd Deceleration lane to Project Power42. To include Maricopa County coordination for obliteration of existing conditions, lime treatment of soils, buildup of a.b., and installation of blacktop. Coordinate Slurry seal to permanent striping.

•Rehrig Pacific 8281 S. Turner Rd Buckeye AZ 85326. Assisted with scheduling all trades and bringing Medium Voltage onto property, 12470v, from APS. Coordinated Union Pacific with a spur off the main railroad to enter onto Rehrig Pacific property.

•Blue Polymers Buckeye AZ. Coordinated subcontractors with lime treatment of soils, coordination of night time concrete slab pours. Coordinated third spur off of UPRR onto Blue Polymers property.

•Department Of Corrections Eyeman Cook Florence AZ. Coordinate with HVAC sub for demolition of existing electrical and equipment for replacement. Impliment and supervise all equipment installation to include all electrical installation/testing and commissioning.

•ADOT Chinle MVD Remodel Chinle AZ. Coordinated with other subs of demolition and reconstruction of existing building upto turn over.

•Under Brignall Construction, coordinate with SRP for new transformer and power feed onto Royal Palm Elementary School property. From ground up, provide all electrical to three new building, three parking lots and one football field. Make/safe demo of three existing building and refurbishment into new classroom space.

Timeline

Construction Superintendent

N/A
1999 - Current

Mathematics

Maricopa Community Colleges, Phoenix College
Michael R. Gonzales