Overview
Work History
Education
Timeline
Generic

Michael Rodman

Gary,IN

Overview

11
11
years of professional experience

Work History

Sub Contractor

Mike Rodman
Gary, IN
08.2011 - Current
  • Hired and oversaw subcontractors to meet project needs.
  • Implemented changes requested by designers, owners or inspectors to conform to specifications or updated demands.
  • Kept site work safe and in line with budget, schedule and applicable building codes.
  • Supervised labor, materials and equipment for large commercial projects with budgets in excess of $[Amount].
  • Checked measurements and completed accurate cuts to prevent materials waste and maintain cost controls.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Completed installations of building structures, trim, flooring and cabinetry.
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.
  • Measured and marked cutting lines on materials using pencil or chalk and marking gauge.
  • Properly poured, set and cured concrete.
  • Repaired roofs and flooring and remodeled bathrooms and kitchens to complete [Number] projects in [Timeframe].
  • Repaired plumbing systems, components and equipment.
  • Appropriately fitted pipes by identifying dimensions, sizes and shapes needed to replace faulty pipes.
  • Installed valves, hangers, supports and flanges inside piping systems.
  • Complied with state plumbing codes throughout duration of each project.
  • Measured, threaded and cut materials to correct angles.
  • Selected type and size of piping required for each project.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Implemented maintenance and repair for fixtures, water mains, natural gas, fire systems, and backflow preventers.
  • Completed preventive maintenance on water heaters, toilets, urinals and plumbing fixtures through [Action] and [Action].
  • Communicated with customers to provide recommendations on repairs, determine project estimation costs and define project completion dates.
  • Filled pipe systems with water and air to determine location of leaks.
  • Requisitioned tools and equipment to select type and size of pipes needed for projects.
  • Provided emergency services to install and repair toilets, water heaters, appliances and showers to maintain [Number]% customer satisfaction ratings.
  • Used [Tool] and [Tool] to fit valves, couplings and assemblies to tanks and pumps.
  • Read blueprints to determine appropriate materials and procedures for each project.
  • Inspected structures to avoid any obstruction and delays throughout project.
  • Cut openings in structures to accommodate pipes and pipe fittings with [Tool] and [Tool].

Education

GED -

ALAN B SHEPARD HIGH SCHOOL
Palos Hills, IL
06.1996

Timeline

Sub Contractor

Mike Rodman
08.2011 - Current

GED -

ALAN B SHEPARD HIGH SCHOOL
Michael Rodman