Summary
Overview
Work History
Education
Skills
Timeline
Generic

Michael Sims

Gilbert,AZ

Summary

Dynamic Steel Erection Foreman with a proven track record at Superior Innovation’s Construction, excelling in safety management and multi-project coordination. Expert in rigging techniques, I consistently enhanced workflow efficiency and fostered teamwork, leading to timely project completions and elevated client satisfaction. Committed to quality and integrity in every aspect of construction.

Construction professional prepared for supervisory roles, bringing track record of overseeing complex steel erection projects. Known for strong team collaboration and adaptability to changing project demands, ensuring seamless operations. Reliable in managing timelines and fostering safe working environment.

Overview

12
12
years of professional experience

Work History

Steel Erection Foreman

Superior Innovation’s Construction
Albany Ny
11.2019 - 05.2026
  • Supervised steel erection processes, ensuring compliance with safety protocols and structural integrity.
  • Coordinated crew activities to optimize workflow and achieve project deadlines efficiently.
  • Trained new hires on safe operation of tools and equipment during steel assembly tasks.
  • Maintained accurate records of daily activities, ensuring clear communication among stakeholders regarding project progress and challenges encountered.
  • Implemented innovative construction techniques that improved overall project timelines without sacrificing quality or safety standards.
  • Enhanced communication between teams, facilitating smoother transitions between project phases and tasks.
  • Implemented best practices for material handling, reducing waste and enhancing productivity on-site.
  • Managed multiple steel erection projects simultaneously, resulting in timely completion of all tasks.
  • Collaborated proactively with engineers, architects, subcontractors, suppliers, inspectors, and local authorities to ensure positive working relationships and smooth operations on job sites.
  • Minimized project downtime by promptly addressing equipment maintenance needs and proactively scheduling preventative maintenance for tools and machinery.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Inspected equipment and tools used for safe operation.
  • Prepared and submitted reports on job progress and safety in conditions to upper management.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Streamlined material movement processes, improving delivery times within the worksite.
  • Monitored lift operations, identifying potential hazards and implementing corrective actions promptly.
  • Moved equipment between job locations using truck and trailer.

Medal Roofer

Progressive Roofing & Construction
Phoenix, AZ
03.2017 - 10.2019
  • Installed metal roofing systems, ensuring adherence to safety protocols and quality standards.
  • Successfully repaired damaged metal roofs by identifying problem areas, removing compromised materials, and installing new panels or components as needed.
  • Maintained high-quality workmanship by diligently inspecting completed installations for proper alignment, fastening, and sealing.
  • Contributed to company reputation for excellence through consistently high levels of professionalism, integrity, and craftsmanship in all aspects of metal roofing work.
  • Contributed to company growth through exceptional customer service, leading to increased referrals and repeat business from satisfied clients.
  • Installed, repaired, and replaced single-ply roofing systems.
  • Managed inventory of roofing supplies and materials.
  • Assisted in removal of old roofing materials and debris to prepare for application of new roofing.
  • Followed manufacturer instructions and specifications to perform proper installation.
  • Precisely cut felt, shingles and strips of flashing to fit angles formed by walls, vents, and intersecting roof surfaces.

Structural Steel Erector

Steel Tech Buildings USA
Estero, FL
01.2014 - 03.2017
  • Operated cranes and rigging equipment for efficient material handling and placement.
  • Interpreted blueprints and project specifications to guide installation processes accurately.
  • Coordinated effectively with crane operators for precise placement of heavy red iron and steel columns and trusses during assembly phases.
  • Sustained a high level of attention to detail throughout all stages of construction ensuring top-notch final products.
  • Contributed to successful project completions by accurately interpreting blueprints and following design specifications.
  • Exhibited versatility by working on diverse projects such as commercial facilities, industrial warehouses, agricultural buildings, and residential properties.
  • Used variety of hand and power tools to complete erection of building.
  • Cleaned and maintained tools, equipment and worksites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Followed instructions and safety protocols while operating machinery and equipment.
  • Operated lulls,telehandlers and boom lifts to complete various phases of building such as setting for columns,trusses,Perlins,girts,and sheeting process.
  • Led structural steel assembly and installation for commercial projects, ensuring compliance with safety regulations.
  • Utilized advanced rigging techniques to safely maneuver heavy steel components during installation processes.

Education

High School Diploma -

Whitmer High School
Toledo, OH
06.2008

Skills

Structural welding

Heavy equipment operation

Layout planning

Safety management

Rigging techniques

OSHA compliance

Load calculations

Crane operation

Erection sequencing

Fall protection

Site supervision

Measuring skills

Hand tool proficiency

Heavy lifting

Cutting techniques

Power tool expertise

Teamwork

Dependable and hardworking

Problem-solving

Time management

Attention to detail

Job site cleanup

Following instructions

Multitasking

Construction safety

Reliability

Team leadership

Active listening

Physical strength and stamina

Decision-making

Self control and integrity

Customer relations

Heavy equipment operations

Site preparation

Multi-project coordination

Stress tolerance

Employee motivation

Work monitoring

Conflict resolution

Loading and unloading trucks

Goal setting

Blueprint reading

Basic mathematics

Quality control

Site measuring and marking

Inventory management

Quality assurance

Timeline

Steel Erection Foreman

Superior Innovation’s Construction
11.2019 - 05.2026

Medal Roofer

Progressive Roofing & Construction
03.2017 - 10.2019

Structural Steel Erector

Steel Tech Buildings USA
01.2014 - 03.2017

High School Diploma -

Whitmer High School
Michael Sims