Summary
Overview
Work History
Skills
Timeline
Generic

Michael Wagner

Staten Island,NY

Summary

Dedicated construction professional with extensive experience at C.N.M. Home Improvements, excelling in problem-solving and teamwork. Proven ability to enhance project efficiency through effective communication and innovative techniques. Skilled in drywall installation and framing, consistently delivering high-quality results while maintaining a safe work environment. Committed to client satisfaction and timely project completion.

Overview

21
21
years of professional experience

Work History

Construction Worker

C.N.M. Home Improvements
Staten Island, NY
01.2018 - 10.2025
  • Followed safety protocols to maintain a secure job site environment.
  • Assisted in framing, drywall installation, and finishing work on residential projects.
  • Collaborated with team members to complete projects within established timelines.
  • Conducted material inventory checks to ensure availability of supplies for ongoing tasks.
  • Maintained clean and organized work areas to enhance efficiency and safety standards.
  • Supported experienced workers by preparing job sites and gathering necessary materials.
  • Participated in training sessions to improve skills and knowledge of construction techniques.
  • Utilized hammers, saws, squares, levels, and fastening devices to complete projects.
  • Maintained clean and organized job sites, contributing to a safe working environment for all employees.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Worked with more knowledgeable professionals to grow understanding of principles and construction standards.
  • Brought materials and tools from trucks and storage facilities to work site locations and organized for expected needs.
  • Completed construction projects on time by adhering to strict deadlines and prioritizing tasks appropriately.
  • Assisted with basic carpentry work such as installing wooden floors and crown molding.
  • Gathered waste and trash from job sites for placement in refuse containers to keep job sites clean and organized.
  • Operated power equipment to move materials and promote job efficiency.
  • Demonstrated safe and proper operation of equipment and tools to prevent harm to team members.
  • Assisted with successful, time-sensitive renovations of various structures.
  • Adapted quickly to changing project requirements, demonstrating flexibility and resourcefulness in adjusting schedules and priorities accordingly.
  • Exhibited exceptional problem-solving abilities under pressure by employing critical thinking skills to overcome complex challenges on job sites.
  • Enhanced project efficiency by coordinating with team members and managing resources effectively.
  • Reduced material waste by accurately calculating requirements and optimizing usage throughout the project lifecycle.
  • Contributed to a positive work culture by fostering teamwork among staff through open communication channels, which led to higher overall productivity levels during projects.
  • Installed new structures, updated systems and replaced worn components to bring buildings up to current codes.
  • Improved client satisfaction by delivering high-quality workmanship consistently, following up on feedback, and addressing concerns promptly.
  • Increased safety awareness through conducting regular training sessions for staff and implementing best practices on the job site.
  • Streamlined communication between team members, leading to increased collaboration and problem-solving capabilities.
  • Negotiated with suppliers to secure materials at competitive prices, impacting bottom line positively.
  • Oversaw daily site operations, ensuring all tasks were completed according to plan.
  • Spearheaded community construction projects, enhancing local infrastructure and resident satisfaction.
  • Coordinated with subcontractors to ensure quality standards, achieving high levels of client satisfaction.
  • Streamlined procurement process for materials, expediting project start times.
  • Managed inventory of construction materials, minimizing waste and reducing costs.
  • Implemented innovative construction techniques, enhancing overall project quality.
  • Improved project delivery timelines by efficiently coordinating tasks among crew members.
  • Assisted in design of cost-efficient, sustainable building solutions, meeting clients' environmental goals.
  • Enhanced team efficiency by streamlining on-site communication protocols.
  • Conducted comprehensive site evaluations before project initiation, identifying potential challenges early.
  • Led team in high-pressure environments to meet strict deadlines, ensuring project completion on time.
  • Enhanced client trust and project transparency by providing regular progress reports.
  • Increased client retention by maintaining open and effective communication throughout project phases.
  • Adapted to rapidly changing weather conditions and schedules, ensuring project continuity and efficiency.
  • Implemented safety protocols, significantly reducing workplace accidents.
  • Used variety of hand and power tools to complete tasks.
  • Cleaned and maintained tools, equipment and worksites.
  • Loaded and unloaded materials onto trucks and trailers.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Installed drywall, siding and other structural components.
  • Managed safe and efficient use of tools and equipment on construction sites.
  • Followed instructions and safety protocols while operating machinery and equipment..
  • Provided labor support to carpenters, masons and other skilled trades.
  • Moved and cleared debris from work sites to dispose of in designated areas..
  • Helped with door and window installations.
  • Inspected tools and equipment to maintain safety and efficiency.
  • Finished surfaces of woodwork or wallboard in houses and buildings with paneling, paint and hand tools.
  • Helped with erecting scaffolding and ladders..
  • Operated hand and power tools for various construction tasks.
  • Sheetrock. Taping, Painting, Carpentry as in
  • Framing walls, Installing doors/windows, Installing moldings and door, Casing, Installing cabinets, (Light) electrical, (Light) Plumbing, Tiling
  • Flooring (wood flooring/floating floors and Tile floors) ,Installing tubs toilets vanity’s medicine cabinets, Tile Backsplashes, Installing dishwasher sinks stoves and refrigerators

Construction Worker

A.B.T Construction
Staten Island, NY
05.2012 - 12.2017

Sheetrock

Taping

Painting

Carpentry as in

Framing walls

Installing doors/windows

Installing moldings and door casing

Installing cabinets

Light electrical

Bathrooms as in

Light plumbing

Flooring (wood flooring/floating floors and Tile floors)

Installing tubs toilets vanity’s medicine cabinets

Laborer

Staten Island Yacht Sales
Staten Island, NY
08.2008 - 01.2012

Cleaned interior and exterior of high-end yachts. I compounded and waxed with a wheel exteriors of the yachts

Laborer

Better Lawns and Gardens
Staten Island, NY
06.2004 - 01.2008

Skills

  • Problem-solving
  • Heavy lifting
  • Construction
  • Attention to detail
  • Power tool operation
  • Team collaboration
  • Worksite safety
  • Painting and finishing
  • Equipment operation
  • Basic carpentry
  • Truck loading
  • Team-oriented and dependable
  • Framing
  • Flooring installation
  • Materials loading
  • Carpentry
  • Worksite preparation
  • Site preparation
  • Drywall hanging
  • Equipment maintenance
  • Framing construction
  • Quality control
  • Material transport
  • Window installation
  • Cabinet installation
  • Wooden formworks
  • Carpentry expertise
  • Time management
  • Dependability and reliability
  • Tile setting
  • Measuring and leveling
  • Spray finishing
  • Construction trade expertise
  • Team player
  • Physical strength and stamina
  • Punctual and dependable
  • Material loading and unloading
  • Worksite safety and maintenance
  • Drywall installation
  • Installation and finishing
  • Form construction and removal
  • Mechanical troubleshooting
  • Materials salvage

Timeline

Construction Worker

C.N.M. Home Improvements
01.2018 - 10.2025

Construction Worker

A.B.T Construction
05.2012 - 12.2017

Laborer

Staten Island Yacht Sales
08.2008 - 01.2012

Laborer

Better Lawns and Gardens
06.2004 - 01.2008
Michael Wagner