Dedicated Class A IOR with 10 years of inspection experience, specializing in healthcare & DSA construction. Proven track record managing complex projects, ensuring code compliance & delivering quality through proactive communication & detailed documentation. Currently seeking a position where I can apply my strong work ethic, organizational abilities, and problem-solving skills to make a substantial impact on project outcomes and overall success.
• Served as Class A IOR for HCAI-regulated incremental milestone projects (IMP), providing continuous inspection & oversight of construction
• Performed inspections of structural, architectural, mechanical, electrical, plumbing, fire life safety, & seismic installations within the scope of IOR responsibilities
• Coordinated required testing, inspection, & observation (TIO) activities with HCAI, design professionals, contractors & special inspectors
• Reviewed approved drawings, specifications, RFI's, ACD's, differed approvals & other HCAI-approved construction documents prior to & during inspection
• Monitored construction progress & identified nonconforming work, deviations, & unresolved inspection items requiring correction or approved documentation
• Prepared comprehensive daily IOR reports documenting work performed, inspections completed, deficiencies, corrective actions & project progress
• Maintained communication with HCAI field staff, design team, general contractor, subcontractors & facility representatives
$800 million nine-story medical tower & Central Energy Plant
$215 million four-story wing and connecting bridge
• Inspected reinforcing steel placement, lap splices, clearances, mechanical couplers, and epoxy-installed reinforcing bars against approved requirements.
• Observed concrete placement and consolidation; performed fresh-concrete testing, cast test cylinders, and inspected batch plant operations.
• Inspected post-installed anchor depth, spacing, edge distance, and embedment; performed torque verification and pull testing with calibrated equipment.
• Inspected spray-applied fireproofing thickness; collected density samples and performed bond testing. Distributed inspection reports, test results, and nonconformance reports.
$244 Million, Seven-Story Hospital Tower
$166 million six-story office building with two subterranean parking levels
• Reviewed approved plans, submittals, and specifications; inspected reinforcing steel, mechanical couplers, epoxy-installed bars, lightweight concrete decks, footings, and shear walls.
• Observed concrete placement and performed fresh-concrete testing; inspected fireproofing thickness and conducted sampling, bond testing, and pull testing.
• Prepared and distributed inspection reports, test results, and nonconformance reports.
Class A IOR #A21357 (Exp. 09/30/27)
ICC #8390835 (Exp. 05/26/30)
Reinforced Concrete
Structural Masonry
Spray Applied Fireproofing
Structural Steel & Bolting