Industrial engineering professional with experience in Project planning, control and execution . Proven ability in Engineering and constructions project excecution and monitoring in Venezuela . In the USA , four years of experience as Electrician. Skilled in process optimization and problem-solving, consistently meeting high standards of quality and efficiency.
- wire installation
- installation of luminaires
- Installation of 3/4 inch, 1 inch
EMT rigid pipe
- Installation of electrical panels
- Installation of security sensors
· - Installation of 3/4, 2, 3, 4 inch EMT rigid pipe
- Installation of electrical panels
- installation of security sensors
- wire installation
- breaker panel Installation
- sensors, emergency shotdowns and electrical disconnec
- wire installation
- installation of luminaires
- Installation of 3/4 inch, 1 inch
- EMT rigid pipe
- Installation of electrical panels
- Installation of security sensors
· - Installation of 3/4 inch, 1 inch
- EMT rigid pipe
- Installation of electrical panels
- wire installation
- installation of luminaires
- Installation of 3/4 inch, 1 inch
- EMT rigid pipe
- Installation of electrical panels
- wire installation
- installation of luminaires
- Installation of electrical wiring
- installation of electrical equipment and accessories
- installation of lamps and emergency system-
his responsibility the supervision of the execute of the engineering phase (conceptual engineering, basic engineering or details) and construction of one or more projects. This should regulate its performance, keep a quality control of the documents generated by it, in addition to controlling the physical execute of the same, must also ensure the financial evolution of this (valuations and billings). It must periodically make a presentation of results product of the progress of the engineering phase that is executed.
his responsibility the supervision of the execute of the engineering phase (conceptual engineering, basic engineering or details) and construction of one or more projects. This should regulate its performance, keep a quality control of the documents generated by it, in addition to controlling the physical execute of the same, must also ensure the financial evolution of this (valuations and billings). It must periodically make a presentation of results product of the progress of the engineering phase that is executed.
Analysis, programming and control of the physical and financial execution of the projects; review and interpretation of progress reports; trend analysis; consolidation and review of budgets and annual disbursements in SINCOP and SAP system; follow up to the procurement processes and contacted involved according to the planning; follow-up on the physical and financial closures of the works; Consolidation of execution and projection control reports in SINCOP and SAP systems; Review of contractor valuations.