Results-driven ERRCS Installation Technician with proven skills in BDA programming, RF testing, and troubleshooting. Experienced in leading inspections and training teams to enhance operational efficiency.
Overview
1
1
Certification
3
3
years of professional experience
Work History
Lead ERRCS Installation/Testing Technician
Hci Systems
Ontario, CA
02.2024 - Current
Lead ERRCS/DAS installation, BDA programming, commissioning, testing, troubleshooting, and final acceptance on commercial and public-safety communication projects.
Commissioned over 10 passive DAS systems and 3 fiber DAS systems, ensuring successful installation and final acceptance.
Program and configure BDA systems across VHF, UHF, 700 MHz, and 800 MHz public-safety bands.
Perform RF testing including VSWR, Return Loss, cable sweep/TDR, spectrum analysis, signal generation, and coverage/grid testing.
Install, fusion splice, test, and troubleshoot fiber DAS infrastructure using optical power meters and calibrated light sources.
Diagnosed complex RF issues across BDA equipment, coaxial distribution, passive components, antennas, fiber links, and uplink/downlink paths, enhancing system reliability.
Interpret system designs and construction drawings, identify field discrepancies, and implement corrective solutions.
Personally lead AHJ inspections and radio acceptance testing, coordinating with Riverside County fire systems inspectors, CAL FIRE, PSEC, Sheriff’s personnel, fire departments, electrical inspectors, and third-party inspection agencies.
Conducted acceptance testing and coordinated with inspection agencies across Riverside, Orange, and Los Angeles Counties, ensuring compliance with local regulations.
Train and direct new ERRCS technicians in installation, RF testing, troubleshooting, commissioning, and field procedures.
Education
Some College (No Degree) - Electrical Technology
San Joaquin Valley College
Ontario, CA
Skills
ERRCS/DAS: BDA Programming Passive DAS Fiber DAS System Commissioning RF Distribution Antenna Verification Grid/Coverage Testing Uplink/Downlink Troubleshooting RF Testing: Spectrum Analyzer Signal Generator Cable Sweep/TDR VSWR Return Loss Fiber: Fusion Splicing Fiber Testing Optical Power Meter Light Source Fiber Link Troubleshooting Equipment: COMBA Safe-Com ADRF Leadership: AHJ Inspections Acceptance Testing Technician Training Construction Coordination Design/Drawing Interpretation