Summary
Overview
Work History
Education
Timeline
Generic

Miguel Rocha

Baytown

Summary

With My Work History I Have Been In The Industrial Industry Since 2004 Learning & Building Myself & My Career For The Future I’m Dependable & Reliable To My Company & My Duties My Number One Goal On Every Job I Step Foot On Is To Deliver The Client A Safe Quality & Productive Job/Product & That Everyone Makes It Home Safe To Their Families

Overview

18
18
years of professional experience

Work History

Rigger Sr. General Foreman

Performance Contractors
01.2023 - 07.2024

Inspection/Credentials Of All Rigging

Practicals For Manlifts/Scissor Lifts/Swing & Fixed

Cab Cranes/Signal Persons

Assemble/Disassemble Cranes

Overview Lift Plans

Build Rigging For Critical Lifts

Delegate Man Power

Order Rigging

Lead Safety Meetings

Rigger General Foreman

Performance Contractors
01.2022 - 01.2023

Inspection Of All Rigging

Inbound/Outbound Of All Cranes

Overview Lift Plans

Build Rigging For Critical Lifts

Plan/Schedule Lifts

Delegate Man Power

Lead Safety Meetings

Rigger Foreman

Performance Contractors
10.2020 - 12.2021

Inspection Of Rigging

Crane Set Up

Planning Of Lifts

Delegating Man Power

Rigger

Jacobs
02.2018 - 08.2018

Inspection Of Rigging

Rigging On Piping

Rigging On Valves

Rigging On Equipment

Rigger

Performance Contractors
10.2016 - 07.2017

Inspection Of Rigging

Rigging On Valves

Rigging On Piping

Rigging On Equipment

Bullrigging Piping

Bullrigging Valves

Bullrigging Equipment

Crane Set Up

Boilermaker

Jacobs
05.2006 - 12.2013
  • Exchanger Work
  • Blinding Systems/Equipment
  • Tower Work
  • Reactor Work
  • Breathing Air/Full Face/Half Mask Work
  • Rigging Valves/Piping/Equpiment
  • Bullrigging Valves/Piping/Equipment
  • Unbolt/Bolt Up Valves
  • Unbolt/Bolt Up Piping
  • Catalyst Change Outs

Education

Process Technology - Plant Operator

Lee College
Baytown, TX

Timeline

Rigger Sr. General Foreman

Performance Contractors
01.2023 - 07.2024

Rigger General Foreman

Performance Contractors
01.2022 - 01.2023

Rigger Foreman

Performance Contractors
10.2020 - 12.2021

Rigger

Jacobs
02.2018 - 08.2018

Rigger

Performance Contractors
10.2016 - 07.2017

Boilermaker

Jacobs
05.2006 - 12.2013

Process Technology - Plant Operator

Lee College
Miguel Rocha