
Engineering executive with 20+ years leading advanced aerospace, space, and defense operations. Proven builder of large-scale greenfield facilities, high-rate production systems, and enterprise technology roadmaps supporting aggressive growth, cost, and quality targets. Deep experience across DoD acquisition, AS9100D quality systems, Lean / Six Sigma, and Industry 4.0. Trusted partner to CEOs and executive teams on CapEx investment, operational readiness, and next-generation manufacturing strategy.
Served as senior engineering authority providing onsite technical leadership to NAVAIR FST, DCMA, and PMA-262, overseeing contractor execution, production readiness, and compliance across critical defense programs.
Acted as primary technical interface to major aerospace suppliers, including frequent on-site leadership at the Triumph facility (Red Oak, TX), driving resolution of production, quality, and manufacturability risks during high-impact build phases.
Led DFMA and process-improvement initiatives across multiple contractors, improving manufacturability, tooling effectiveness, and component quality while protecting airworthiness and certification requirements.
Governed engineering change activity, RCCA validation, and drawing updates, assessing downstream impacts to tooling, production flow, cost, and schedule to ensure stable, repeatable manufacturing.
Directed a multi-year, multi-contractor deep-dive of the MQ-4C Triton wing manufacturing system, delivering a 62% reduction in defects per 1,000 labor hours and 70%+ improvement in yield.
Performed independent engineering analyses and audits to validate contractor RCCA processes against industry standards, strengthening supplier accountability and corrective-action rigor.
Led engineering oversight for advanced airborne structures supporting the Littoral Surveillance Radar System, including pod structures, electrical hardware, ECS systems, and P-3C Orion structural modifications.
Directed manufacturing execution, engineering changes, drawing revisions, hardware design updates, and risk management, using EVMS and program metrics to maintain cost, schedule, and technical performance.
Conducted proposal evaluations, product inspections, first article inspections, and acceptance reviews, ensuring compliance with contractual, airworthiness, and customer requirements.
Resolved cross-prime integration challenges between sensor and platform contractors, ensuring end-to-end system functionality and performance post-integration.
Led teams through 50+ structural and sub-assembly modifications, accelerating pod structure build rates by 30% while maintaining flight safety and certification standards.
Recognized with Employee of the Quarter and multiple Above & Beyond awards for technical leadership and program impact.