Summary
Overview
Work History
Education
Skills
Timeline
Generic

Mike Edelman

Burlingame,CA

Summary

Experienced sign maker and installer with a strong background in CNC machining, Sign Installation and Sign Engineering. Looking forward to using my experience to help drive impactful signage solutions.

Overview

12
12
years of professional experience

Work History

Sign Maker / Installer

Andresen SF
Burlingame, CA
01.2018 - Current
  • Operate Zund CNC and Trotec Laser.
  • Paint. Mathews and water based.
  • Fabricate. Aluminum, plastic, and wood.
  • Install. All vinyl types, window filma, and all types of rigid signs.
  • Sign Engineer. Helped the front office plan and engineer the more complex signs.

Sing Maker

Moquin Press
Belmont, CA
03.2016 - 01.2018
  • Operated Vutek GS3200 and Zund CNC cutter.
  • Fabricated. Acrylic and Wood
  • Paint. Water based and oil based.
  • Installed vinyl, window film and some rigid signs.
  • Helped engineer the more complex signs.

CNC Department Lead

Garnett Sign Studio
South San Francisco.
08.2014 - 02.2016
  • Operated two Multicams and one Epilouge Laser.
  • Scheduled jobs and managed one other person for the CNC department.
  • Before moving to the CNC department I was in charge of the digital printing and cut vinyl department. Operated a Rolands roll to roll, a Mimaki desktop flat bed printer, a vinyl plotter and a roll to roll laminator.
  • Installer. The first year at Garnett was spent installing.

Education

High School Diploma -

Palo Alto Preparatory
Palo Alto, CA
06-1995

Skills

    Detailed knowledge in many areas of sign production and installation

    Decades of experience in CNC machining, installing and fabricating

    Very comfortable engineering signs that are complex and one of a kind

Timeline

Sign Maker / Installer

Andresen SF
01.2018 - Current

Sing Maker

Moquin Press
03.2016 - 01.2018

CNC Department Lead

Garnett Sign Studio
08.2014 - 02.2016

High School Diploma -

Palo Alto Preparatory